Similar Projects
2020 Water Main Improvements
Infrastructure
Bidding
$2,000,000 est. value
Heyworth, IL

Water Main Improvements
Infrastructure
Post-Bid

Sewer Extension
Infrastructure
Post-Bid
Downs, IL

FY2022 Utility Maintenance
Results
Bloomington, IL

Oak Street Water Main Replacement
Alteration
Results
Normal, IL

Water Extension
Infrastructure
Post-Bid
Downs, IL

White Oak Road and Hovey Avenue Water Main Extension
Infrastructure
Results
Normal, IL

Division Street Water Main Replacement
Alteration
Results
Chenoa, IL

2022 Sewer Rehabilitation
Infrastructure
Results
Bloomington, IL

Sugar Creek Force Main Improvements
Infrastructure
Results
Bloomington, IL

Locust Street CSO Elimination and Water Main Replacement Phase III
Infrastructure
Results
Bloomington, IL 61701

Settled Water Piping Improvements
Infrastructure
Results
Bloomington, IL

FY22 CCTV Sewer Inspection
Infrastructure
Results
Bloomington, IL

FY23 Utility Maintenance
Infrastructure
Results
$396,000 est. value
Bloomington, IL

FY23 Sewer Rehabilitation
Infrastructure
Results
$425,000 est. value
Bloomington, IL 61701

Reported 06/30/2022 03:21 PM
Project Title

Locust Street CSO Elimination and Water Main Replacement - Phase 4+5 Construction - City of Bloomington

Physical Address View project details and contacts
City, State (County) Bloomington, IL 61701   (McLean County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected November 2022
Bids Due View project details and contacts
Estimated Value $2,190,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a civil project in Bloomington, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project. As of June 29, 2022, an engineer has been selected and this project is in the design phase. A firm timeline for construction has not been determined. The Illinois Environmental Protection Agency (IEPA) has provisionally authorized the City to discharge combined sewer overflow (CSO) effluent at Locust Street and Colton Avenue, with the requirement that the City eliminate combine sewer overflow (CSO) before the expiration of the provisional permit in 2030. The City intends to use borrowing and a portion of ARPA funds to construct Phase 4 and 5 of a multi-phase plan to eliminate that CSO. Final CSO elimination is expected to be complete in 2026, to maintain compliance with the IEPA permit. This project is in included in the City of Bloomington FY 2023 Capital Improvement Plan (CIP). *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents