Similar Projects
Airport Terminal Roof Replacement
Renovation - 8,000 SF
Sub-Bidding
$325,000 CJ est. value
Klamath Falls, OR 97603

Earl Hall Re-Roofing Project 2023
Renovation
Sub-Bidding
$600,000 CJ est. value
Eugene, OR 97403

Mills School and Pelican School - Roof Repair Project
Alteration
Post-Bid
Klamath Falls, OR 97601

Well One Membrane Roof, Overhead Doors, HVAC
Alteration
Post-Bid
Boardman, OR

Baker Center Roofing Replacement
Alteration
Results
Eugene, OR 97401

Woodstock Library - Restore Roof
Alteration
Results
$160,000 to $180,000 est. value
Portland, OR 97206

Memorial Union Gutters and Roof Remediation
Renovation
Sub-Bidding
$3,800,000 CJ est. value
Corvallis, OR 97331

Henley Middle School - Partial Roof Replacement
Alteration
Post-Bid
Klamath Falls, OR 97603

UO Baker Center Roof Replacement PH2 Area F
New Construction, Demolition, Alteration
Results

Re-roof Project Health & Wellness Center
Renovation - 45,000 SF
Sub-Bidding
$500,000 CJ est. value
Warm Springs, OR 97761

Yamhill Carlton HS Voluntary Seismic Strengthening
Alteration
Post-Bid
Yamhill, OR 97148

Bonnie L Hays Animal Shelter Roof Replacement
New Construction, Demolition
Results
Hillsboro, OR 97123

Marshall High School Building 100 Renovation
Renovation
Sub-Bidding
$300,000 CJ est. value
Bend, OR 97701

Mazama High School - Partial Roof Replacement
Alteration
Post-Bid
Klamath Falls, OR 97625

Ainsworth Annex Re-Roof
Term Contract
Results
$700,000 est. value
Portland, OR 97201

Last Updated 04/24/2023 11:42 AM
Project Title

Forest Grove Armory Bldg 1002 Reroof

Physical Address View project details and contacts
City, State (County) Salem, OR 97301   (Marion County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $86,295 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work in general consists of providing all material, labor and equipment necessary to replace all existing roofing, insulation, flashings, parapet coverings, gutters and downspouts for the entire roof system for building number 1002. The single Point of Contact "POC" for all questions regarding the ITB, forms, Specifications, Plans, bidding process, changes, clarifications, requests for brand approval, substitution requests, the award process, protests and any other issues that may arise is Name: Sam Goff - CPPB Phone: 971-355-4167 E-mail: samuel.a.goff.nfg@army.mil The project includes but is not limited to the removal and replacement of the existing standing seam metal roof, insulation, gutters, and down spouts at the Forest Grove Armory Building 1002. This ITB is advertised as a "Bid Solicitation" in the Oregon Buys web-based eProcurement system. See ITB section C.1.6 - Oregon Buys for information regarding vendor registration and terminology used in Oregon Buys platform. o This document must be viewed electronically to access files, forms, provisions or other documents provided via hyperlinks within this ITB. Prospective Bidders that do not have compatible software or are unable to open any of the attached documents, forms or Addenda may contact the Purchaser listed in Oregon Buys for alternative electronic formats or hard copies. The following range is a project estimate for bonding purposes only: $100,000.00 to $120,000.00. Drawings are diagrammatical; dimensions take precedence over scale, and the Contractor shall verify all dimensions and ensure that all contents of the drawings are covered. For example, at times Electrical may be included in the Mechanical section or Mechanical may be in the Architectural section. If an item in Architectural or Mechanical requires a circuit, then it shall be the responsibility of the Contractor to include the coordinate the disciplines for a complete and usable facility. Items not indicated in the Statement of Work, specifications, and drawings that can be legitimately and reasonable inferred to complete the work must be furnished by the Contractor as though it were detailed herein. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents