Similar Projects
Nottingham Park Improvements
New Construction, Infrastructure - 3,400 SF
Design
$10,000 CJ est. value
Avon, CO 81620

Lionshead Place
Renovation
Design
$1,100,000 est. value
Vail, CO 81657

RFP Vail Athletic Field Renovation Project 2022
Infrastructure
Bidding
$500,000 CJ est. value
Vail, CO 81657

Vail Golf Course Hole #6 Lightning Shelter Project 2022
Infrastructure
Bidding
$82,000 CJ est. value
Vail, CO 81657

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Midland Avenue Streetscape Project
Infrastructure
Post-Bid
Basalt, CO 81621

Swift Gulch Employee Housing Project
New Construction
Results
Avon, CO 81620

Spring Creek Village
New Construction - 214,996 SF
Construction
Gypsum, CO 81637

Employee Housing Project
New Construction
Pending Verification
Avon, CO

Willits Condominium Development
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Basalt, CO 81621

Forest Road / Multi Residential, Lot 2, Block 1, Vail Village Filing 3
New Construction
Design
$2,300,000 est. value
Vail, CO 81657

Streamside Amenities for the Healthy Rivers and Streams Basalt Whitewater Park
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Basalt, CO 81621

Baumstark Residence / Multi-Residential
New Construction, Infrastructure - 37,941 SF
Pending Verification
$2,700,000 CJ est. value
Vail, CO 81657

East Vail Multi Residential
New Construction
Design
$17,000,000 est. value
Vail, CO

West Beaver Creek Boulevard Asphalt Overlay
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Avon, CO 81620

Last Updated 08/18/2022 05:03 PM
Project Title

435 Eby Creek Apartments

Physical Address View project details and contacts
City, State (County) Eagle, CO 81631   (Eagle County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 30-dwelling unit apartment building on 2.804 acres. As of August 18, 2022, the applicant is looking to receive major development approval. They are scheduled to appear before the Town of Eagle Town Council on August 23, 2022. An architect and general contractor have been selected. No firm construction timeline has been obtained at this time.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 30 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents