Similar Projects
Shoal Road to Crouse Utility Connection - Lincoln County
Infrastructure
Conception
$2,750,000 est. value
Lincolnton, NC

6th and Graham Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
Less than $11,600,000 est. value
Charlotte, NC 28202

Water System Improvements
Infrastructure
Design
$500,000 est. value
NC

Utility Construction and Paving
Infrastructure
Bidding
$3,000,000 est. value
NC

MOTSU Firefighting Water System
New Construction, Infrastructure
Bidding
$10,000,000 to $25,000,000 est. value
Southport, NC

2020 Street, Drainage, Water and Sewer Improvements
Post-Bid
$630,000 to $730,000 est. value
Dunn, NC 28334

FY 2018 CDBG15-I-3047 Water System Improvements Phase II
Post-Bid
Plymouth, NC

Design Build Services for a 24-Inch Water Main Extension
Results
Less than $7,267,250 est. value
Concord, NC 28026

2018 Water System Improvements
Results
Less than $1,013,675 est. value
Roper, NC 27970

Long Creek Water Quality Enhancement Project - City of Charlotte
Infrastructure
Conception
$1,950,000 est. value
Charlotte, NC 28263

Large Meter Replacements - Phase 3
Infrastructure
Bidding
$585,000 to $595,000 est. value
Wilmington, NC

Wastewater Flow Meter Calibration Services
Post-Bid
Gastonia, NC

16" Deep Raw Water Main Upgrade - Southern Outer Banks Water System
Results
Less than $450,000 est. value
Currituck, NC 27929

Ribbon Walk Wetland - City Of Charlotte
Infrastructure
Conception
$1,500,000 est. value
Charlotte, NC

Water and Sewer Rehabilitation - Division 3
Infrastructure
Bidding
$500,000 est. value
Smithfield, NC 27577

Reported 07/18/2022 11:33 AM
Project Title

Transmission Midway Road To West Brunswick Treatment Facility - Brunswick County

Physical Address View project details and contacts
City, State (County) Bolivia, NC 28422   (Brunswick County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $29,320,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will provide 54,200' of additional sewer force main transmission capacity within the southeast sewer transmission system by constructing force main improvements between the Highway 211/Midway Road intersection and the West Brunswick Wastewater Treatment Facility. The actual alignment of force main improvements will be dependent on the actual location of future sewer demands and project timing in conjunction with other associated projects. As of July 15, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents