Similar Projects
Construction Management-at-Risk (CMAR) Services for the Greenland Water Reclamation Facility (WRF)
Design
Jacksonville, FL 32202

Ocean Outfall Legislaton Program, Construction Package St-1B, Oxygenation Trains 1-7 Rehabilitation and Electrical Buildings
Bidding
$74,143,770 est. value
Miami, FL 33170

WRF Chlorine Contact Chamber Modifications
Bidding
$650,000 est. value
Ormond Beach, FL

Design-Build Services for the Expansion of the Big Coppitt Wastewater Treatment Plant
Post-Bid
$4,000,000 to $7,000,000 est. value
Key West, FL 33040

Bee Ridge Water Reclamation Facility Expansion/Conversion to AWT CM at Risk Services
Addition
Post-Bid
Less than $150,000,000 est. value
Sarasota, FL 34240

Construction Manager at Risk, Northwest Water Reclamation Facility
Results
Less than $29,000,000 est. value
Saint Petersburg, FL 33710

Construction Manager at Risk Services - Embassy Hills Wastewater Treatment Plant Rehabilitation and Improvements
Results
$585,000 est. value
Port Richey, FL 34668

New Headworks and Grit Removal Facility
Construction
$11,900,000 est. value
Clearwater, FL 33756

CR 136/I-75 Wastewater Treatment Plant
Construction
Less than $1,365,194 est. value
FL

WWTF Clarifier Drive Replacement Project
Renovation
Bidding
Atlantic Beach, FL

Bee Ridge WRF Interim Process Improvements Design-Build
Post-Bid
Less than $3,000,000 est. value
Sarasota, FL 34240

Construction of Vactor Dump Site WRF#2
Results
Ocala, FL 34471

South Martin Regional Wastewater Treatment Plant Filter and Chlorine Contact Basin Improvements
Construction
Hobe Sound, FL 33455

Wastewater Reclamation Facility Process Valves Replacement Project
Bidding
Miramar, FL 33027

Northeast Water Reclamation Facility Clarifier 5 Improvements
Post-Bid
Less than $1,154,000 est. value
Saint Petersburg, FL 33702

Last Updated 04/01/2021 02:57 AM
Project Title

MS WRF Chlorine Contact Chamber

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33755   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $110,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City operates two (2) chlorine contact chambers (CCCs) at the Marshall Street Water Reclamation Facility (WRF). The inner CCC needs repair at the weir wall before the dechlorination tank as it may be the source of external seepage during operation. Phase 1 will include crack injections and waterproofing expansion joints along the weir wall. Phase 2 includes lining a portion of the inner CCC with a coating system. A Phase 3 additive alternative is also proposed to waterproof the Outer CCC expansion joint at the weir wall, if Phase 1&2 repairs fail to stop the external seepage.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents