Similar Projects
Last Updated | 06/01/2023 03:42 PM |
Project Title | Union Road Bridge at San Benito River (Bridge No. 43C0067) Bridge Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Hollister, CA 95023 (San Benito County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $36,329,582 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of replacing the existing bridge structure on Union Road spanning the San Benito River including approach roadway improvements. The new bridge will be constructed along a new alignment to the south from the existing location and the intersection of San Benito Street and Union Road would be relocated with an approximate 350-foot extension of San Benito Street to the realigned portion of Union Road. The intersection at Cienega Road and Union Road would be reconstructed with a slight adjustment to orient the intersection with the realigned Union Road. The existing structure will remain to carry the existing traffic during the construction of the new structure and then removed once the new structure is built and traffic diverted onto it. Existing and previous bridge structures would be removed from the river channel following completion of the new bridge, and riparian vegetation would be restored. As of June 1, 2023 a general contractor has been awarded. Construction is anticipated to start in June or July 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's Estimated Cost: $36,000,000 to $37,500,000 Bid Bond Percentage: 10 Project Duration: 440 Workdays DBE Goal Percentage: 18% Liquidated Damages: $11,500.00 Per Calendar Day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |