Similar Projects
Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

Pavement Repairs for Berman and Citrus Roads Project
Infrastructure
Bidding
San Antonio, TX 78226

SL 13 - Resurface Roadway
Infrastructure
Bidding
$6,944,749 est. value
TX

2020 Street Maintenance Project
Post-Bid
Saint Hedwig, TX 78152

FY 2021 Pavement Preservation Package 1 - Crack Seal Task Order Contract
Post-Bid
$495,000 est. value
San Antonio, TX 78205

Southern Region Disaster Recovery Support BPA
Results

2017 Bond Program - Pedestrian Mobility and Streets Task Order Contract Package 8
Results
Less than $4,000,000 est. value
San Antonio, TX 78205

VA - Traffic Control Devices
Infrastructure
Bidding
$1,483,011 est. value
TX

Toepperwein Road Improvement
Post-Bid
Converse, TX 78109

Asphalt Rejuvenator
Results
Less than $600,000 est. value
San Antonio, TX 78207

VA - Traffic Control Devices
Infrastructure
Bidding
$999,713 est. value
TX

Construction of Johnson Ranch North Unit 9 Public Water, Wastewater, Paving and Drainage Improvements and Johnson Ranch North Unit 9 Private Paving and Grading Improvements
Post-Bid
San Antonio, TX

Formal Annual Contract for Removal of Sidewalk Trip Hazard
Term Contract
Results
San Antonio, TX 78200

2021 Street Maintenance Project
Term Contract
Post-Bid
Windcrest, TX

Ft. Sam ISD New Roadway (Winans Road to Rittiman Road)
Results
$1,218,000 est. value
San Antonio, TX 78283

Last Updated 01/07/2022 03:01 PM
Project Title

Zona Cultural Streets Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78220   (Bexar County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $29,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

African American Business Enterprise: 5%. Work consists of roadway reconstruction, traffic and pedestrian signal upgrades, new street lighting, sidewalk widening along with streetscape and landscape improvements, new bus shelters and pedestrian amenities including lighting in accordance with Zona Cultural themes and materials. project consists of three 2017 Bond Projects, including Commerce Street (Frio Street to Santa Rosa Street), San Saba Street (Nueva Street to Martin Street) and Santa Rosa Street (Cesar Chavez Boulevard to Martin Street). The City’s vision for the project is to strengthen the Zona Cultural District multi-cultural identity, history and community. To ensure a multi-modal destination street environment with wide, comfortable and protected sidewalks and crosswalks, protected bicycle facilities along Santa Rosa, enhanced transit facilities, traffic calming with opportunities to drop-off and pick-up, and prioritize key nodes and high impact design elements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents