Similar Projects
DEMA HVAC Service, Repair, Maintenance
Alteration
Bidding
Bellemont, Buckeye, Florence, Marana, Phoenix, Show Low, AZ 85008

SFB Multiple HVAC Project
Alteration
Bidding
Buckeye, AZ 85326

WAPA DSW HVAC Controls
Post-Bid
Phoenix, AZ 85005

Cooling Tower Replacement
Post-Bid
Goodyear, AZ 85395

Boiler Inspection Services
Results
Phoenix, AZ

Franklin at Brimhall Chiller Controls and Plant Controls Upgrade
Results
Mesa, AZ 85206

LDS Encanto Meeting House -- HVAC
Renovation
Construction
$450,000 est. value
Phoenix, AZ 85035

DEMA HVAC Chemical Water Treatment and Maintenance Program
Alteration
Bidding
Phoenix, AZ 85034

J043--644 - Annual Chiller, Condensers, & Evaporator Testing
Post-Bid
Phoenix, AZ 85012

Shepherd Junior High Chiller Controls and Plant Controls Upgrade
Results
Mesa, AZ 85205

Kitchen Exhaust Hood Cleaning for ASPC-Perryville, ASPC-Lewis
Alteration
Bidding
Buckeye, Goodyear, AZ 85395

HVAC System Coil and Air Handler Cleaning
Term Contract
Post-Bid
Phoenix, AZ 85003

Red Mountain Ranch Elementary Cooling Tower Repairs
Term Contract
Results
Mesa, AZ 85215

Public Housing HVAC Replacement
Alteration
Bidding
Chandler, AZ 85225

Chemical Water Treatment
Post-Bid
Luke Air Force Base, AZ 85309

Last Updated 10/20/2021 03:53 PM
Project Title

West Courts Hot Water Boilers Replacement

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85003   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing building domestic hot water system is being replaced with (2) new dedicated hot water heaters / boilers to serve the building domestic water requirements. The removal and installation of the domestic hot water system must be performed and scheduled as needed such that the following system performance requirements are maintained throughout the construction period: 1. The building domestic hot water system shall generate 140 Deg F water which will be stored in domestic hot water storage tanks. The domestic hot water system will include mixing valves which will provide 120 Deg F water to the building. 2. The revisions to the building domestic hot water system shall be performed in a manner and with a schedule as needed to maintain a constant 120 Deg F water supply to the building throughout the construction period. 3. The removal and installation of the existing & new domestic hot water system must be done with a “phasing” approach as necessary to maintain the previously noted 120 Deg F requirement.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents