Similar Projects
Wastewater Treatment Plant Expansion - River Ridge Development Authority
Infrastructure
Conception
$40,000,000 est. value
Jeffersonville, IN 47130

Project Green
New Construction, Infrastructure - 673,000 SF
Conception
$361,000,000 CJ est. value
Fort Wayne, IN 46809

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

Building 764 Addition and Alteration
Addition, Demolition, Renovation, Infrastructure - 20,493 SF
Bidding
$10,000,000 CJ est. value
Fort Wayne, IN 46809

Water Reclamation Facility Expansion
Infrastructure
Bidding
$215,000 CJ est. value
Charlestown, IN 47111

Reserve on Park Public Improvements and Roadway Extension
Infrastructure
Sub-Bidding
$535,000 CJ est. value
Fort Wayne, IN 46845

Franke Park Renaissance Phase 1 Construction Management
New Construction
Post-Bid
Fort Wayne, IN

Payton County Park Improvements
Renovation
Post-Bid
Fort Wayne, IN

River Ridge Elevated Water Storage Tanks
Results
Jeffersonville, IN 47130

Reverse Osmosis System Upgrade
Results
$25,000 to $100,000 est. value
Fort Wayne, IN

Scooter's Coffee / Decatur
New Construction, Infrastructure - 664 SF
Construction
$200,000 CJ est. value
Decatur, IN 46733

Main Street (FKA Woerner Avenue) Floodwall Gate Replacement
Demolition, New Construction, Infrastructure
Construction
$4,497,000 CJ est. value
Clarksville, IN 47129

North Wastewater Treatment Plant - River Ridge Development Authority
New Construction, Infrastructure
Pending Verification
$42,000,000 CJ est. value
Charlestown, IN 47111

North River Development
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Fort Wayne, IN 46802

Last Updated 06/14/2023 08:05 AM
Project Title

McCormick's Creek State Park - Sewer System Improvements - Division A - Sanitary System Regionalization

Physical Address View project details and contacts
City, State (County) Spencer, IN 47460   (Owen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $4,724,241 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of Mach 7, 2023, construction is underway and expected to be completed by the end of May 2023, however, an exact timeline for construction has not been confirmed. This project includes but is not limited to the regionalization of McCormick's Creek State Park's wastewater system by discharging all wastewater into the neighboring Town of Spencer's wastewater system. The work includes construction of two (2) new wastewater lift stations, upgrades and replacements to two (2) existing lift stations, three (3) new grinder stations, a half-mile of new gravity sewer, approximately one (1) mile of new force main, approximately 1/3 mile of low pressure sewer, conversion of an aeration tank to an equalization basin, abandonment of the remainder of the Park's WWTP, abandonment of one (1) existing lift station, an INDOT highway crossing, installation of a flow meter and sampling station, site improvements, electrical work, erosion control, maintenance of traffic, bypass pumping, dewatering, pavement repairs, and all other work required for the complete regionalization project. The OWNER reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Additional questions concerning access to the website may be directed to Commonwealth Engineers, Inc. at (317) 888-1177 or email to jchipman@contactcei.com. MBE (7%), WBE (5%) *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents