Similar Projects
Highway Safety and Drainage Improvements
Renovation
Design
Calverton, Wainscott, NY 11933

Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Design-Build Services for Flood Mitigation at Twenty-Six Substations
Infrastructure
Bidding
$50,000,000 to $100,000,000 est. value
Brooklyn, Manhattan, NY

Replacement of Culverts at West Main Street and Grant Street
Post-Bid
Middletown, NY 10940

Limestone Creek and Bishop Brook Stream Bank and Riparian Buffer Improvement
Post-Bid
Fayetteville, NY

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Floodwall Repairs - Ellenville
Results
$250,000 to $500,000 est. value
Ellenville, NY

Fy22 Buffalo North Breakwater Repair
Infrastructure
Bidding
Buffalo, NY 14203

Pre-Cast Catch Basin and Frame and Grate
Term Contract
Post-Bid
Schenectady, NY

Replace Drain Lines
Results
New York, NY 10035

Hicks Hill Road Slope Stabilization
Post-Bid
Pine Plains, NY

Parker Road Over Breen Brook, Culvert Replacement
Results
Hadley, NY 12835

Underdrain Installation and Connection at Misc. Locations
Post-Bid
Endwell, NY

County Route 16 (North Quaker Lane) Road Improvement Project
Results
Poughkeepsie, NY

Timber Bridge and Culvert Materials and Salt Storage Building Materials
Term Contract
Post-Bid
NY

Reported 06/23/2022 12:00 AM
Project Title

Design-Build Services for the Rockaway Line Long Term Flood Mitigation

Physical Address View project details and contacts
City, State (County) NY   (Queens County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value Greater than $100,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install flood mitigation and prevention elements at critical assets on the Rockaway Line in the Borough of Queens (the “Contract”). The flood mitigation and prevention elements shall be designed to reduce exposure to damage and to minimize delays in return to operation following a shutdown caused by severe meteorological events, such as hurricanes and floods.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents