Similar Projects
Rover Elementary Grading and Drainage Project
Bidding
Tempe, AZ 85283

Spillway Slope Repair
Infrastructure
Bidding
$450,000 est. value
AZ

Gladden Farms Mike Etter Boulevard (North)
Post-Bid
Marana, AZ 85635

Pipelining and Drainage Services
Post-Bid
Phoenix, AZ 85007

San Tan West Area Drainage Master Plan-On Call
Results
$800,000 est. value
AZ

South Recharge Phase II
Results
Less than $8,300,000 est. value
Gilbert, AZ 85233

Dick Mccomb Park Pump Replacement and Pond Improvement
Infrastructure
Bidding
Surprise, AZ 85374

Site drainage improvements at District Wide Sites
Post-Bid
Tucson, AZ 85743

CMAR Mountain Dell Channel Improvements
Results
Flagstaff, AZ 86001

N112 Culvert Installation
Infrastructure
Bidding
Fort Defiance, AZ

No Name Lake Backwater Rehabilitation Project
Post-Bid
Parker, AZ

High Desert Middle School Concrete and Drainage Project
Results
Less than $150,000 est. value
Globe, AZ 85501

Sun City Drains Improvement - Grand Avenue, Del Webb to Agua Fria
Infrastructure
Bidding
Phoenix, Sun City, AZ 85042

Annual Culvert Pipe
Term Contract
Post-Bid
Safford, AZ

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Last Updated 10/19/2021 03:28 AM
Project Title

Donnelly Wash Low Flow Crossing at Florence-Kelvin Highway

Physical Address View project details and contacts
City, State (County) Florence, AZ 85132   (Pinal County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on the Florence-Kelvin Highway at the Donnelly Wash Crossing approximately 17 miles east of State Route 79 just southeast of the scenic recreational area known as “The Boulders” in Township 5 South, Range 12 East, Section 15 of Gila River Base and Meridian, Pinal County, Arizona. The Scope of Work consists of constructing a five cell 10-foot by 4-foot box culvert and a six cell 10-foot by 4-foot box culvert, both crossing north and south underneath the Florence-Kelvin Highway at Donnelly Wash; erosion protection along the east and west side of the gabion mattress adjacent to the box culverts; installation of a guardrail along the deck assembly; and other related work

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents