Similar Projects
2021/22 Collector Street Pavement Improvements - Hoover Avenue - City of Ames
Infrastructure
Conception
$2,000,000 CJ est. value
Ames, IA 50010

Power Plant Building Office Entrance - City of Ames
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Ames, IA 50010

2025/26 Cyride Facility Improvements - Addition to New/Existing Facility - City of Ames
Addition, New Construction, Infrastructure
Design
$750,000 CJ est. value
Ames, IA 50011

Cogeneration System Maintenance - City Of Ames
Renovation, Infrastructure
Design
$1,335,000 CJ est. value
Ames, IA 50010

RFP Engineering - Engineering Services for GT1 MCC Retrofit
Renovation, Infrastructure
Bidding
$450,000 CJ est. value
Ames, IA 50010

RFP - Ames Industrial Park Development
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Ames, IA 50010

Test Drilling at North River Valley
Infrastructure
Post-Bid
$50,000 est. value
Ames, IA

PCC Sidewalk/trail
Infrastructure
Results
$967,666 CJ est. value
Ames, IA 50014

Story County Conservation Sopers Mill River Water Access
Infrastructure
Results
$146,432 CJ est. value
Ames, IA 50010

Therkildsen Industrial Engineering Building
New Construction, Infrastructure - 42,600 SF
Construction
$54,000,000 CJ est. value
Ames, IA 50010

Ballard Dental
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Huxley, IA 50124

North Dayton Industrial Park
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Ames, IA 50010

2021/22 Storm Water Facility Rehabilitation - City of Ames
Infrastructure
Conception
$150,000 CJ est. value
Ames, IA 50010

Unit 8 Superheat Replacement - City of Ames
Renovation, Infrastructure
Design
$6,550,000 CJ est. value
Ames, IA 50010

Concrete Repairs at Athletics Locations
Infrastructure
Post-Bid
$80,000 CJ est. value
Ames, IA 50010

Last Updated 06/30/2023 09:05 AM
Project Title

Lime Lagoon Improvements - City of Ames

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,353,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lime residuals from the water softening process are stored and dewatered in large storage lagoons. The material is removed annually in the fall and recycled by applying it to farm fields as an agricultural liming agent. The cost of the annual removal and application is budgeted in the operating budget. A project is underway in FY 2021/22 to rebuild the trench drain in the bottom of one of the oldest cells. These drains aid in the dewatering process. Over time, they have plugged with fine lime particles and have been damaged due to the excavation of lime from the cells using a back hoe. The same modifications are planned for the two oldest cells for FY 2024/25 ($222,000). The purchase of a replacement decant pump ($55,000) is also planned for FY 2024/25. A project that will partially subdivide the large north cell is planned for design in FY 2024/25 with construction the following year. FY 2024/25 Underdrain replacements ($222,000); replacement decant pump ($55,000); design of new cell ($131,000) FY 2025/26 Construction of new cell ($1,131,000) As of July 13, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. As of June 30 2023, no new information available

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents