Similar Projects
Grade, Drain, Base and Pave to extend an Industrial Park Access Road off SR-129 for 1,700 Ft
Post-Bid
$500,000 to $600,000 est. value
Winfield, AL 35594

Planing, Resurfacing, Striping and Guardrail on CR-14 from SR-253 to SR-129
Post-Bid
Hamilton, AL

Southern Region Disaster Recovery Support BPA
Results

Pavement Rehabilitation along Buccaneer Street from Airport Road to 10th Ave SW And intersection widening on Airport Road at SR-171 (US-43)
Results
Less than $776,406 est. value
Hamilton, AL 35570

Full Depth Reclamation (FDR)
Post-Bid
Hamilton, AL 35570

Constructing the Planing, Resurfacing, Guardrail Safety Improvements
Results
$5,556,807 to $6,791,653 est. value
AL

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Constructing the Planing, Resurfacing, Widening, Guardrail Steel Blockout Replacement, and Traffic Stripe
Results
$10,809,611 to $13,211,747 est. value
AL

Constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-241 from the Junction of SR-172 in Bear Creek to the Franklin County Line
Results
$918,962 to $1,123,176 est. value
AL

Constructing the Planing, Resurfacing, Guardrail Steel Blockout Replacement, and Traffic Stripe
Results
$1,505,603 to $1,840,181 est. value
AL

2019 RAA Annual Grant Street Resurfacing Project
Results
Brilliant, AL

Constructing the Planing, Widening, Resurfacing, Guardrail Installation, and Traffic Stripe
Results
$5,997,664 to $7,330,479 est. value
AL

Constructing the Safety Improvements (Curve Warning Sign Installation) on various routes in the West Central Region (Fayette Area)
Results
$613,780 to $750,175 est. value

Constructing the Planing, Resurfacing, Guardrail Steel Blockout Replacement, and Traffic Stripe
Results
$8,229,190 to $10,057,898 est. value
AL

Constructing the Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-241 from the Junction of CR143 to Mp 11.086 South of the Junction of SR-172 in Bear Creek
Results
$2,325,764 to $2,842,600 est. value
Bear Creek, AL

Last Updated 09/18/2020 01:30 PM
Project Title

Resurface on 2nd Street, East and West, CR-121, Hill Road,Engle Road and Union Hill Cemetery Road

Physical Address View project details and contacts
City, State (County) Hackleburg, AL 35564   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $475,553
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents