Similar Projects
Tertiary System Rehabilitation - Phase 1 - 8613 - City of Riverside
Renovation
Conception
$1,000,000 CJ est. value
Riverside, CA 92504

Wastewater Treatment Plant Demolition of Abandoned Headworks, Primary Clarifier, Sand Filter - 21-06 - City of Palm Spring
Demolition, Infrastructure
Conception
$2,635,000 CJ est. value
Palm Springs, CA 92264

Robert A. Skinner Water Treatment Plant Battery Energy Storage System (BESS) Fiber Optic Cable Installation
Renovation - 2,000 SF
Bidding
$137,500 CJ est. value
Winchester, CA 92596

Replacement of Ion Exchange Treatment Plant No. 7991
New Construction, Renovation, Infrastructure
Bidding
$6,000,000 CJ est. value
Mecca, CA 92254

Prequalification Of Bidders For The Construction Of The Regional Water Reclamation Facility Expansion Project
Addition, Demolition, Infrastructure
Post-Bid
$210,000 CJ est. value
Lake Elsinore, CA 92530

Landscape Renovation, Perris / Menifee Desalter I Facility
Infrastructure
Post-Bid
$200,000 CJ est. value
Perris, CA 92571

Temporary Relief of Waste Water Treatment and Sewage Plant Operator
Renovation
Results
Blythe, Chino, Chowchilla, Coalinga, Corcoran, Crescent City, Imperial, Ione, Jamestown, Sacramento, Susanville, Tehachapi, Wasco, CA 91710

Moreno Valley Regional Water Reclamation Facility Plant 2B Equipping and Flow Diversion Project
Renovation, Infrastructure
Results
$40,129,713 CJ est. value
Moreno Valley, CA 92551

Wastewater Treatment Plant Sludge Drying Beds - 21-05 -City of Palm Spring
Renovation
Conception
$1,100,000 CJ est. value
Palm Springs, CA 92264

Perris Valley Regional Water Reclamation Facility (PVRWRF)Tertiary Effluent Pumps 1,5,6, and 7 Variable Frequency Drives (VFD) Replacements
Infrastructure
Post-Bid
$400,000 CJ est. value
Perris, CA 92585

Water Quality Control Plant - Biosolids Equipment and Piping Rehabilitation - 9178 - City of Riverside
Infrastructure
Conception
$1,250,000 CJ est. value
Riverside, CA 92504

Water Quality Control Plant - Chlorine Contact Basin Rehabilitation - 9179 - City of Riverside
Renovation
Conception
$1,800,000 CJ est. value
Riverside, CA 92504

Water Quality Control Plant - Digester No. V Rehabilitation - 9124 - City of Riverside
Infrastructure
Conception
$3,000,000 CJ est. value
Riverside, CA 92504

Water Quality Control Plant - Headworks Area Rehabilitation - 9117 - City of Riverside
Renovation
Conception
$12,642,600 CJ est. value
Riverside, CA 92504

Water Quality Control Plant - Plant II Sludge Pumps I and II Rehabilitation - 9119 - City of Riverside
Infrastructure
Conception
$2,625,700 CJ est. value
Riverside, CA 92504

Last Updated 09/29/2022 09:39 AM
Project Title

Water Reclamation Facility No. 2 Odor Control and Flow Equalization Project

Physical Address View project details and contacts
City, State (County) Corona, CA 92879   (Riverside County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $8,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

***As of September 29, 2022. All bids rejected. Online Q&A Yes Q&A Deadline 06/15/2022 5:00 PM (PDT). Scope of Services The Project will consist of the following: o Decommission and demolish existing flow equalization (EQ) ponds No. 1 and No. 2 o Design and construct new EQ basins in the location of EQ pond No. 2. o Decomission and demolish existing screw pump station downstream from the existing EQ ponds. Replace with a Vaughn chopper centrifugal pump configuration. o Design and construct a new coarse bubble aeration system to mix and freshen the wastewater in the new EQ basins. o Design and construct an odor control biofilter system. o Design and construct aluminum covers for odor control over the grit chamber, primary clarifiers, and new EQ basins. o Design and construct all new facilities with safe access for inspection and cleaning. o Design and construct sitework, including concrete, grading, paving, piping, and miscellanerous site improvements, as needed. o Modifications to existing facilities, as needed. o All electrical infrastructure, including conduits, pull boxes, wiring, grounding, enclosures; VFD's and on-site electrical infrastrucutre; surveying; geotechnical engineering; permitting and regulatory approvals including AQMD compliance. o SCADA programming and system integration to be coordinated with City's SCADA programming vendor. o Provide startup, performance testing, and operations training to City staff. SUBMISSION OF PROPOSALS FOR THIS PROJECT IS SUBJECT TO CITY OF CORONA PUBLIC WORKS & UTILITIES DEPARTMENT PREQUALIFIED DESIGN-BUILD ENTITIES ONLY. The City previously conducted a public invitation to prequalify Design-Build (D-B) Entities specific to this Project and will only consider proposals submitted by prequalified Design-Build Entities. The list of prequalified Design-Build Entities approved to submit proposals is available for download using the Documents & Attachments Tab. All pre-approved D-B Entities shall access the Documents & Attachments Tab to review and download all RFP documents. The solicitation documents include, but are not limited to, request for proposals, bridging documents, specifications, general conditions, and required proposal forms. Please allow sufficient time to fully complete and upload all documents prior to the submission deadline. Request for Proposal documents can be uploaded, modified or withdrawn any time prior to the submission deadline. Please review the E-bidding Instructions FAQs uploaded to the Documents & Attachments Tab to familiarize yourself with the PlanetBids system. The PlanetBids system will not accept late proposal packages. No exceptions.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents