Similar Projects
Bridge Rehabilitations
New Construction, Infrastructure
Results
$5,000,000 to $7,500,000 est. value
MO

2 Bridge Replacements
New Construction, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
MO

9 Bridge Rehabilitations and Coldmill and Resurface
New Construction, Infrastructure
Results
MO

Bridge Rehabilitation
New Construction, Infrastructure
Results
$25,000,000 to $50,000,000 est. value
MO

Geraldine Avenue Bridge Reconstruction
New Construction, Infrastructure
Bidding
Saint Ann, MO 63074

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Bridge Replacement
New Construction
Results
$5,000,000 to $7,500,000 est. value
MO

Bridge Rehabilitation
New Construction, Infrastructure
Results
$25,000,000 to $50,000,000 est. value
MO

2021 Bridge Deck Sealing
New Construction
Results
Wildwood, MO

Big Bend over I-44
New Construction, Infrastructure
Post-Bid
Crestwood, MO 63126

Bridge Redeck
New Construction, Infrastructure
Results
$5,000,000 to $7,500,000 est. value
MO

14 Bridge Rehabilitations
New Construction, Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Saint Louis, MO

Bridge Replacement, Grading and Pavement
New Construction, Infrastructure
Results
MO

Mississippi Greenway - (061) Old Chain of Rocks Bridge Steel Repairs
Renovation
Post-Bid
Saint Louis, MO

New Ballwin Bridge No. 349
New Construction, Infrastructure
Post-Bid
Ballwin, MO 63024

Last Updated 02/21/2022 06:56 AM
Project Title

14 Bridge Rehabilitations and 11 Bridge Rehabilitations

Physical Address View project details and contacts
City, State (County) MO   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000,000 to $50,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6I3149 Route I-55 ST LOUIS County. 14 Bridge Rehabilitations from Holly Hills Ave to Arsenal St, the total length of improvement being 3.888 miles. (2): Job J6I3187 Route I-55 ST LOUIS County. 11 Bridge Rehabilitations from Lindbergh Blvd (61/67) to Holly Hills Ave, the total length of improvement being 5.654 miles.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents