Similar Projects
SR 788 Bridge Replacement
Demolition, New Construction, Infrastructure
Design
$520,000 CJ est. value
Wellston, OH 45692

Roadway Minor Rehab - US 35
Infrastructure
Design
$4,641,076 CJ est. value
Jackson, OH 45640

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Jacking and Boring Services
Infrastructure
Post-Bid

Box Culverts
Infrastructure
Post-Bid

Culvert Replacement - JAC-SR 776-06.18 Bridge Replacement
Infrastructure
Results
OH

JAC-CR15 (Camba Road)-1.91 at Grade Railroad Crossing Project
Infrastructure
Results
$298,918 CJ est. value
Bloomfield Township, OH 45640

Bellisio Foods / Jackson
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Jackson, OH 45640

Infrastructure Improvements - Storm and Sanitary Sewers
Infrastructure
Bidding
$4,500,000 CJ est. value
Wellston, OH 45692

Concrete Pipes
Infrastructure
Post-Bid

2021 CDBG Program Oak Hill Water Project
Infrastructure
Results
$322,175 CJ est. value
Oak Hill, OH 45656

Precast Catch Basins, Risers, and Grates
Infrastructure
Post-Bid

Concrete Pipes
Infrastructure
Post-Bid

Micro Surface Sealing
Infrastructure
Post-Bid
$300,000 CJ est. value
Bloomfield Township, OH 45640

Last Updated 03/18/2023 01:03 AM
Project Title

Culvert Replacement - US 279

Physical Address View project details and contacts
City, State (County) Oak Hill, OH 45656   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

PID: 111040 State Route 279 Culvert Replacement Project will replace a culvert along S.R. 279 between Dan T Davis Road and Frank Puckett Road. Estimated Start Date: 6/1/2023 Estimated Completion Date: 8/1/2023 Project Cost: $174,214 Traffic Impacts: The roadway will be closed for the durration of the project and the de- tour will be derermined at a later date. _______________________________________ OHDOT - Culvert Replacement - US 279 Contract ID: JAC111040

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents