Similar Projects
Water System Improvements - Phase I - Collector Well No. 3 - 2022
Infrastructure
Bidding
$2,600,000 to $2,900,000 est. value
Boardman, OR

NW Cornell Road - NW 102nd Avenue to NW 113th Avenue
Alteration
Bidding
$7,000,000 to $10,000,000 est. value
OR

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Post-Bid
Hood River, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

NW 9th - NW Hoyt Street System Improvements - CM/GC
Infrastructure
Bidding
OR 97209

Awbrey Butte Distribution Improvements
Alteration
Post-Bid
Bend, OR

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

South West 209th Avenue Kinnaman Road to Alexander Street 36-Inch PVC Pipe
Infrastructure
Bidding
$150,000 to $200,000 est. value
Aloha, OR 97007

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Bidding
$30,000,000 est. value
OR

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

US97 - Redmond - Bend Project the Dalles-California Hwy
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Redmond, OR

Last Updated 12/14/2021 06:10 AM
Project Title

Nixyaawii One

Physical Address View project details and contacts
City, State (County) Pendleton, OR   (Umatilla County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of, but is not limited to, constructing approximately 3,700 feet of new paved road; approximately 1,800 feet of new paved alley; gravity sewer and water lines; stormwater facilities; utility trenching with conduits for power, telephone, gas, and fiber optics; site grading; lighting; landscaping; park improvements; and other Work as specified and/or as shown on the Drawings to serve the subdivision.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete, Glass-Fiber-Reinforced Concrete.
Division 12 - Furnishings.
Division 26 - Electrical, Exterior Lighting, Area Lighting.
Division 31 - Earthwork, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents