Similar Projects
Resurface, Signals, and ADA
Infrastructure
Bidding
$750,000 to $1,000,000 est. value
Wentzville, MO

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

Implementing Traffic Control Signaling Devices and Roadway Improvements
Infrastructure, Alteration
Post-Bid
Wentzville, MO

Hanley Road Reconstruction and Improvements
Infrastructure
Results
Dardenne Prairie, MO

Muegge Road
New Construction, Infrastructure
Post-Bid
Saint Charles, MO 63302

2021 Partial Depth Repairs
Infrastructure
Results
Saint Peters, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Main Street Improvements (Oak Street to Saint Charles Street)
Infrastructure
Results
Cottleville, MO

Engineering Services for Route Z Widening and Signalization
New Construction, Infrastructure
Post-Bid
Wentzville, MO

Mexico Road Resurfacing and Pedestrian Bridge Phase 3
New Construction, Infrastructure
Results
O Fallon, MO

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Asphalt Project 2021
Infrastructure
Results
Wentzville, MO 63385

Last Updated 06/01/2022 10:40 PM
Project Title

2022 Trail Sealing

Physical Address View project details and contacts
City, State (County) Weldon Spring, MO   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All work shall be completed by September 15, 2022.The Contractor shall furnish all of the labor, materials, machinery, and equipment and perform all of the work outlined in the specifications and plans entitled 2022 Trail Sealing, prepared by the City of Weldon Spring, 5401 Independence Road, Weldon Spring, Missouri. The Work to be done under this Contract consists of constructing and completing all work described in the proposal, attached. Any person or firm may withdraw the proposal by written request at any time prior to the scheduled time for the opening of the proposals.The City may request interviews from the finalists. The City shall not be responsible for any costs incurred by the Vendor during the interview process. The City will perform whatever research it deems necessary into the Bidder's history, financial viability, and references. The Bidder shall cooperate with the City by providing appropriate information. The City of Weldon Spring reserves the right to reject any and all proposals and to negotiate any particulars in the proposals received. Collusion between applicants is sufficient cause to disqualify all those involved

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents