Similar Projects
Horseshoe Bend Road, State Street / Hill Road - Ada County Highway District
Infrastructure
Conception
$1,064,000 CJ est. value
Eagle, ID 83616

Horseshoe Bend Road, State Street / Hill Road - Ada County Highway District
Infrastructure
Conception
$1,064,000 CJ est. value
Eagle, ID 83616

Julia Davis River Node Memorial Construction
Infrastructure
Design
$600,000 CJ est. value
Boise, ID 83702

Peak at Sawtooth Village
New Construction, Infrastructure - 4,846 SF
Design
$1,400,000 CJ est. value
Meridian, ID 83646

Booster Station Replacement - Phase II Rebid
Demolition, New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Moscow, ID 83843

RFQ Construction Manager - Construction Manager/General Contractor Services - Automotive/Agricultural Diesel Mechanics Facility
New Construction, Infrastructure - 40,000 SF
Bidding
$15,000,000 CJ est. value
Twin Falls, ID 83301

Element Hotel by Marriott / Driggs
New Construction, Infrastructure - 67,657 SF
Sub-Bidding
$20,000,000 CJ est. value
Driggs, ID 83422

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

Parking Lot and Utilities Demolition
Infrastructure
Post-Bid
Coeur d'Alene, ID 83814

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Mill and Inlay on I-90 From Wallace MP 63 to Mullan MP 68
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

40 McKercher Boulevard Multi-Residential
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Hailey, ID 83333

Lava Ridge Wind Project
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Shoshone, ID 83352

RFQ - Site Utilities, Twin Falls Readiness Center
Infrastructure
Conception
$1,200,000 CJ est. value
Twin Falls, ID 83301

Plantation Golf Course and Country Club
Renovation, Alteration
Design
$300,000 est. value
Boise, ID 83714

Last Updated 09/08/2022 02:34 PM
Project Title

RFP Engineering - Concept Development for Pedestrian and Bicycle Improvements

Physical Address View project details and contacts
City, State (County) Ketchum, ID 83340   (Blaine County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected August 2025 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 8, 2022, a design engineer has not been selected. However contractor bidding is not expected to take place for several years. *The previous solicitation is listed below for reference The City of Ketchum (City) seeks proposals from qualified design firm licensed in the State of Idaho to develop a multi-modal concept plan for the pedestrian and bicycle improvements in the downtown Community Core. The primary goals include; develop a multimodal concept plan that can guide the development of a cohesive and low stress facility, evaluate options for the separation of multimodal facilities from motor vehicle traffic, create typical cross sections, identify the relationship of the concept plan with other modes of travel, develop an implementation and maintenance strategy, and identify funding opportunities and wayfinding/branding strategies. This document will be used for program specific construction projects and may be used to guide design standards for future development along the corridor. The proposed project consists of all site development including installation of curb, gutter, sidewalk, asphalt patching; ADA-compliant pedestrian ramps, retaining walls, site lighting, storm drainage and other appurtenances in Ketchum, Idaho. The City reserves the right to reject any and all proposals or any part thereof, to waive any formalities or informalities and further, to award the services to the most responsive and responsible Consultant, according to the Citys evaluation and as deemed to be in the best interest of the City. The City may opt to conduct interviews at its own discretion following the proposal deadline. The method of contractor selection has not been determined at this time.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents