Similar Projects
US 101/Schaerer Creek to Hood Canal - Remove Fish Barrier
Infrastructure
Conception
$2,661,000 CJ est. value
Cosmopolis, WA 98537

SR 105/S of Fairmount Ave - Culvert Replacement
Infrastructure
Conception
$2,945,000 CJ est. value
Aberdeen, WA 98520

US 12/Satsop River Bridge EB - Bridge Painting
Renovation, Infrastructure
Design
$4,410,000 CJ est. value
Aberdeen, WA 98520

US 101/Chicken Coop Creek - Remove Fish Barrier
Infrastructure
Design
$2,472,000 CJ est. value
Cosmopolis, WA 98537

OR- Region Wide Crack Sealing
Infrastructure
Bidding
$2,000,000 CJ est. value
Central Park, WA 98520

OR- Region Wide Crack Sealing
Infrastructure
Bidding
$2,000,000 CJ est. value
Central Park, WA 98520

East Pioneer Improvements Academy to Glenn
Infrastructure
Post-Bid
Montesano, WA 98563

Greenwood Tie
Infrastructure
Post-Bid
WA

Miller Junior High School Site Preparation for Covered Area
Infrastructure
Results
Aberdeen, WA 98520

Downtown Aberdeen Revitalization Traffic Improvements
Infrastructure
Results
$1,200,000 to $1,500,000 est. value
Aberdeen, WA 98520

Satsop Haul Road Emergency Erosion Protection
Infrastructure
Construction
$305,312 CJ est. value
Aberdeen, WA 98520

SR 109/N of Moclips Highway - Stabilize Slope
Infrastructure
Design
$1,824,000 CJ est. value
Hoquiam, WA 98550

Airfield Pavement Maintenance
Term Contract
Post-Bid
Hoquiam, Quincy, WA 98550

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

SR 105/W Harriman St Signal - Roundabout
Infrastructure
Design
$1,000,000 CJ est. value
Aberdeen, WA 98520

Last Updated 05/04/2023 10:07 AM
Project Title

RFQ Engineering - Sumner Ave Pedestrian Improvements

Physical Address View project details and contacts
City, State (County) Aberdeen, WA 98520   (Grays Harbor County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Aberdeen is soliciting statements of qualifications (SOQs) from qualified firms to provide Engineering services to include survey, project management, transportation design, stormwater design, NEPA CE, pre-ROW, ROW, and construction management as part of a Federally funded project to construct pedestrian improvements including curb, gutter, sidewalks, and ramps and other enhancements as necessary to complete gaps between N Williams St and Myrtle St.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents