Similar Projects
GRSM 158579/202623 - Look Rock Rehabilitation
Renovation
Design
$1,000,000 to $5,000,000 est. value
Maryville, TN

Sewer System Improvements Express Mart Pump Station Replacement
Bidding
TN 37847

Franklin Southeast Basin Pilot Treatment Facility and Redwing Reclaimed Water Pump Station
New Construction
Bidding
Franklin, TN

Pump Station and Basin Improvements - Phase 2 - (Contract A)
Post-Bid
Chattanooga, TN 37402

Pump Station Safety Improvements Part 1 Brainerd Golf Course Pump Station Safety Improvements
Post-Bid
Chattanooga, TN 37405

23rd Street Pump Station Elevator Upgrade
Results
Less than $136,065 est. value
Chattanooga, TN 37402

Dupont Pump Station and Basin Improvements - Phase 2(Contract B)
Results
Less than $4,532,420 est. value
Chattanooga, TN 37402

Contract 121- Hayshed Road and Luke Lane Sewer Improvements
Bidding
Charlotte, TN 37036

Part 2 Selected Pump Station Safety Upgrade Smurray Hills 5 and Brainerd Manor
Post-Bid
Chattanooga, TN 37402

Sequatchie Water Booster Pump Station
Results
Jasper, TN 37347

Soddy Daisy Industrial Park Pump Station Controls and Force Main Upgrade (Phase I)
Renovation
Bidding
$250,000 to $500,000 est. value
Chattanooga, TN 37404

Gibson Creek Equalization Facility
New Construction
Post-Bid
Nashville, TN 37115

Upgrade of Green Gap and Roy Lane Pump Stations
Results
Chattanooga, TN

North Johnson Road Pumping Station Improvements And Force Main
Renovation, Alteration
Bidding
Germantown, TN 38138

Lift Station 8 and 9 Replacement
New Construction
Post-Bid
Lexington, TN

Reported 05/12/2021 12:00 AM
Project Title

Influent Screening Improvements

Physical Address View project details and contacts
City, State (County) Mount Pleasant, TN   (Maury County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes installing a mechanical-cleaned bar screen as well as a screening washer and compactor at the existing influent pump station

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents