Similar Projects
Reported | 12/01/2021 02:38 PM |
Project Title | Design Build Repair Communications Facility, B405 Project JLSS 20-0004 |
Physical Address | View project details and contacts |
City, State (County) | Coraopolis, PA 15108 (Allegheny County) |
Category(s) | Commercial, Professional Services |
Sub-Category(s) | Architectural, Communication Building, Engineering |
Contracting Method | Competitive Bids. |
Project Status | Project Delayed |
Bids Due | View project details and contacts |
Estimated Value | $500,000 to $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13). Line item one: : Contractor shall furnish all supervision, labor, materials, tools, equipment, apparatus, and transportation required to provide design by retaining an Architect/Engineer (A/E) who will complete design documents in accordance with the phases and schedule stated herein. The design shall include work of all trades required to result in a complete and functional project, ready for use. For REPAIR COMMUNICATION FACILITY, B405 PROJECT JLSS 20-0004. IMPORTANT see attached JLSS 20-0004 B405 HVAC SOW Rev 0 Line item two: Repair Communications Facility, B405 PROJECT JLSS 20-0004 Modify/upgrade heating, ventilating, and air conditioning (HVAC) system including air handling equipment, ductwork, insulation, and local controls. Modernize fire protection system and architectural features (flooring, walls, and doors). Project work specific to HVAC to include: Server Room #2 will be fitted with similar Computer Room Air Conditioning (CRAC) units as Server Room #1 to provide n+1 redundancy; the Switch Room will be fitted with CRAC units with redundancy; the north building core spaces will be provided with supplemental variable refrigerant flow (VRF) units; exhaust air service to remove hydrogen off-gassing from the valve regulated lead-acid (VRLA) batteries will be installed and; recommissioning of the existing building HVAC units and rebalancing of the airside. Existing ductwork and rooftop units will remain as-is to ensure ventilation air is maintained to building spaces and preclude disruption to building services and occupants. Building areas served by fan coils and unit heaters, which are unaffected by the existing rooftop unit, will remain as-is. Architectural project work to include raised flooring in corridor between Server Room 1 and 2 with ramp and lockable door. Recommissioning of the existing building HVAC units and rebalancing of the airside is included in this scope. . IMPORTANT see attached JLSS 20-0004 B405 HVAC SOW Rev 0 |
||||||||||||||||||||||||||||||||||||
Details | Architectural, Renovation, Communication Building, Renovation.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |