Similar Projects
Horizontal Hung Steam Coil Blower Air Handler Replacement
Bidding
Waterbury, CT 06704

Repair/Replace HVAC Autologic Controls
Term Contract
Bidding
Wallingford, CT

Cooling Tower Replacement and Sprinkler System Modification
Post-Bid
Seymour, CT

Chillers Service Maintenance and Repairs
Term Contract
Post-Bid
Waterbury, CT 06706

Replacement of the Air Handling Units at Amity Regional High School
Results
Less than $644,000 est. value
Woodbridge, CT 06525

Service to Cooling Tower, Chiller and Condenser
Results
Waterbury, CT

Amity High Cooling Tower Piping Replacement
Bidding
Woodbridge, CT 06525

RTU Replacement to Long River Middle School
Post-Bid
Prospect, CT 06712

Furnace Replacement
Results
East Haven, CT 06513

HVAC and Process Improvements at The Lake Whitney Water Treatment Plant
Bidding
New Haven, CT

J045--PM Boiler Burners
Post-Bid
Newington, West Haven, CT

HVAC and Electrical Upgrades at Melissa Jones Elementary School
Results
Less than $1,374,300 est. value
Guilford, CT

HVAC System Maintenance and Repair Services
Term Contract
Bidding
Wallingford, CT

Fire Headquarters Kitchen Hood Project
Post-Bid
Naugatuck, CT 06770

Mini-Split AC/Heat Pump Installations, 6 Locations in CT
Results
Colebrook, Middlebury, Stamford, Thomaston, CT 06905

Last Updated 01/29/2020 12:52 PM
Project Title

Furnish and Install Replacement HVAC Unit at Parks and Recreation Gymnasium

Physical Address View project details and contacts
City, State (County) Wallingford, CT   (New Haven County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Engage the services of a competent and qualified HVAC contractor to replace an existing unit serving one-half of the gymnasium space at the Parks & Recreation Facility at 6 Fairfield Boulevard in Wallingford, Connecticut. Heating to this space (half gymnasium) is presently provided by a gas-fired unit hung from the underside of the roof trusses and exhausts through the rooftop. As maintenance access is difficult to this unit, this project will replace it with a new heating/ cooling unit to be pad-mounted on the ground outside of the south gymnasium wall. The contractor shall modify/ replace the existing supply and return ductwork and natural gas piping to accommodate this modification. This includes, but is not limited to, removing and reinstalling the existing roof truss mounted ductwork to serve the replacement unit. The gymnasium space being served by the new unit is 90’ long x 64’ wide x 30’ tall. The remaining half gymnasium space will continue to be served by an existing unit to remain.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents