Similar Projects
Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Pavement Preservation
Infrastructure
Bidding
$1,271,000 est. value
AZ

FY22 Pavement Rehabilitation Project Phase 2
Infrastructure
Bidding
Prescott, AZ

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road
Post-Bid
Prescott, AZ 86305

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

Capacity Additions (Major Widening)
Results
Less than $8,590,000 est. value
AZ

Prescott Fire Center - Crack & Fog Seal and Re-Stripping
Results
$25,000 to $100,000 est. value
Prescott, AZ

Penn Avenue/Eastwood Drive Improvements Project
Infrastructure
Bidding
Prescott, AZ 86303

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

FY 21 Slurry Seal Project
Results
Less than $1,400,000 est. value
Chino Valley, AZ

Roadway and Parking Lot Crack Seal with Seal Coat Applications
Post-Bid
Prescott, AZ

Intersection Improvement
Results
Less than $1,200,000 est. value
Chino Valley, AZ

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Post-Bid
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Cottonwood Street Visibility Improvements and Willard Street Dip Repair Project
Results
Cottonwood, AZ 86326

Rubberized Chip Seal Pavement Preservation
Infrastructure
Post-Bid
$3,132,345 est. value
Prescott, AZ

Last Updated 02/25/2022 07:28 AM
Project Title

Rubberized Chip Seal Pavement Preservation

Physical Address View project details and contacts
City, State (County) Prescott, AZ   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,420,184
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for the placement of a rubberized chip seal and fog seal on Iron Springs Road, Kirkland Valley Road, Beaver Creek Road, Montezuma Lake Road, and Verde Valley School Road. Project length is approximately 35.7 miles, and the total estimated quantity of area to receive the rubberized chip seal is approximately 708,221 square yards. Total estimated quantity of fog seal coat is estimated at 70,822 gallons. In addition, existing AR-ACFC surface shall be removal by micro-milling at Beaver Creek Road with a total estimated quantity of 82,119 square yards. Other associated work includes restoring pavement markings and installing 216 linear feet of preformed thermoplastic rumble bars.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents