Similar Projects
Air Conditioner Replacement - Board of Education Offices
Post-Bid
Less than $49,999 est. value
Leonardtown, MD 20650

Air Conditioner Replacement - Board of Education Office Building II
Post-Bid
Less than $49,999 est. value
Leonardtown, MD 20650

On-Call Maintenance Services for Heating Ventilation and Air Conditioning (HVAC)
Results
$100,000 to $500,000 est. value
Hanover, MD 21076

HVAC Services
Results
Leonardtown, MD 20650

Heating and Cooling Valve Replacement - Leonardtown High School
Post-Bid
Less than $49,999 est. value
Leonardtown, MD 20650

Air Conditioner Unit Replacement Board of Education Offices
Term Contract
Results
Leonardtown, MD 20650

HVAC Preventative Maintenance and Repair Service
Term Contract
Post-Bid
California, MD 20619

Natatorium Main Pool HVAC Replacement Project
Results
$2,000,000 to $2,200,000 est. value
Saint Marys City, MD 20686

Chopticon High School Cooling Valve Replacement
Post-Bid
Morganza, MD 20660

Water Chiller Replacement - Town Creek Elementary
Results
Lexington Park, MD 20653

Install Air Conditioning in the War Room
Results
Patuxent River, MD 20670

HVAC Control Parts
Results
Loveville, MD 20656

Installation of HVAC Controls
Results
Loveville, MD 20656

Air Conditioner Unit Installation
Results
Less than $49,999 est. value
Mechanicsville, MD 20659

Waring Commons HVAC Replacement Project
Results
Saint Marys City, MD 20686

Last Updated 05/06/2020 09:36 AM
Project Title

Temporary Cooling Town Creek Elementary School

Physical Address View project details and contacts
City, State (County) Lexington Park, MD 20653   (Saint Marys County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will supply, deliver, remove, set up, take down, and provide all labor to supply and connect a 60 - 80 ton water chiller for the purposes of providing temporarily cooling function of a water chiller system that is undergoing a replacement (under a separate contract). The expected duration of the rental and operations will be 2.5 months/10 weeks with an expected operational time of approximately 8 hours a daily. The contractor is responsible for all field measurements and estimating, the following information is provided to help the contractor understand the scope of the project. Also see the drawing of the site lay out with connection points, and lay down area.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents