Similar Projects
LiDestri Conveyor Bridge System & Tank Farm Expansion
New Construction
Design
Rochester, NY 14606

Sloatsburg Cemetery Bridge Replacement
Post-Bid
Suffern, NY 10901

Fall Creek Suspension Bridge Preventive Maintenance
Renovation
Post-Bid
$350,000 to $365,000 est. value
Ithaca, NY 14853

Rehabilitation of I-90 Bridges Over Fuller Road and Erie Boulevard/Canadian Pacific RR in the City of Albany
Results
Less than $5,800,000 est. value
Albany, NY 12201

Bridge Replacement of CR 160 (Burtonville Road Spur) Over Tributary of Schoharie Creek Bin 3310140
Results
Fonda, NY 12068

Albright-Knox Gundlach Art Museum AK360 Expansion
New Construction - 29,000 SF
Construction
$155,000,000 est. value
Buffalo, NY 14222

Ludlowville Road (CR 159) Bridge over Salmon Creek Bridge Replacement
Post-Bid
Lansing, NY

Bridge Replacement CR13 Barkersville-Fayville Road Over Cadman Creek
Results
Ballston Spa, NY 12020

Keuka Lake Waterfront Access Improvements - Pedestrian Bridge and Boardwalk
Post-Bid
Hammondsport, NY 14840

Replacement of Richfield Street Bridge Over Steele Creek BIN 2266840
Results
Mohawk, NY 13407

CR23B (Main Street) over the Shingle Kill Bridge Rehabilitation
Post-Bid
Cairo, NY

Lake Drive Over Quassaick Creek Bridge Replacement
Results
Newburgh, NY 12550

Rehabilitation of West River Drive Bridge Over Parks Creek (BIN 3335400) for the 2020 Construction Season
Post-Bid
Nichols, NY 13812

Burtonsville Bridge - Bridge Deck Joint Replacement
Results

Concrete Bridge Deck Panels
Term Contract
Post-Bid
Kingston, NY 12402

Last Updated 10/28/2021 09:25 AM
Project Title

Dow Road over Bidwells Creek Bridge Replacement

Physical Address View project details and contacts
City, State (County) NY   (Livingston County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include, but not be limited to, removal of the existing steel girder superstructure and replacement with Tappan Zee concrete bridge panels founded on integral abutments on piles. The existing abutments will be cut down but remain in place, and the proposed abutments will be built behind them. Medium stone fill will be placed in the vicinity of the new bridge abutments. There will be full-depth pavement reconstruction extending approximately 230 feet within the limits of the project along with a pipe extension on the east side of the structure.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents