Similar Projects
General Plumbing Work at Town Facilities for Fiscal Year 2023
Term Contract
Bidding
$15,000 est. value
Tyngsborough, MA

Replace HVAQC System Brigade HQ Building 102 - GC Bid
Alteration
Bidding
$1,000,000 est. value
MA

Replace HVAQC System Brigade HQ Building 102 - SUB Bid
Alteration
Sub-Bidding
$1,000,000 est. value
MA

Watertown Middle School - Second Floor HVAC Upgrade
Alteration
Sub-Bidding
$1,400,000 est. value
Watertown, MA 02472

Emergency and Preventive Maintenance Plumbing Services
Term Contract
Post-Bid
Less than $45,000 est. value
Acton, MA 01720

Purchase and Install HVAC Ionization and UV System Upgrades at Library Facilities
Post-Bid
Concord, MA

J041--Inspect and Clean Ductwork Bedford Massachusetts VAMC
Results
Bedford, MA 01730

Watertown Police Department Firing Range HVAC Upgrades - General Bids
Results
Less than $450,000 est. value
Watertown, MA

Watertown Middle School - Second Floor HVAC Upgrade - General Bid
Alteration
Bidding
$1,400,000 est. value
Watertown, MA 02472

Barbieri Warehouse Rooftop Unit
Post-Bid
$300,000 est. value
Framingham, MA

Watertown Police Department Firing Range HVAC Upgrades - Filed Sub Bids
Results
$425,000 est. value
Watertown, MA 02472

Barbieri Cafe Expansion Plumbing
Alteration
Bidding
$60,000 est. value
Framingham, MA 01702

Air Vent Cleaning of Aviation Hangars
Post-Bid

Mercier Center HVAC Renovation
Results
Less than $58,500 est. value
Lowell, MA 01854

Chiller System Replacements at the Innovation Academy
Post-Bid
Tyngsborough, MA 01879

Last Updated 05/10/2022 02:40 AM
Project Title

Weston High School Wing F Roof Replacement - Sub Bid

Physical Address View project details and contacts
City, State (County) Weston, MA 02493   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate The Work consists of the replacement of the EPDM roof system over Wing F of the Weston High School. Scope consists of replacement of the roof system in its entirety over this area, including roof drains, scuppers, masonry flashing, edge metal flashing, and walk pads. The overall area for wing F is approximately 14,000 square feet. Other work includes electrical and HVAC disconnects and replacements, new exposed ductwork insulation and flashing, and below deck work associated with ductwork and roof drains and with interior ceiling work for insulating below the deck

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents