Similar Projects
Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition of Louie B. Nunn Cumberland Parkway
Infrastructure
Conception
$4,400,000 CJ est. value
Glasgow, KY 42141

Langley Bullock Industrial Development / Hebron
New Construction, Infrastructure - 230,000 SF
Design
$123,510,000 CJ est. value
Hebron, KY 41048

Welding Alloys Storage Building
New Construction, Infrastructure - 16,000 SF
Design
$1,700,000 CJ est. value
Florence, KY 41042

Pollard Mills Infrastructure Project Phase 2
Infrastructure
Bidding
$900,000 CJ est. value
Ashland, KY 41101

Pollard Mills Infrastructure Project Phase 2
Infrastructure
Bidding
$900,000 CJ est. value
Ashland, KY 41101

Mcalpine Waterline Repair/Replacement
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Louisville, KY 40212

Engineering Services for Water Main Expansion
Infrastructure
Post-Bid
Burlington, KY

Action for Eastern Montana Glasgow Head Start Facility
Infrastructure
Results
$380,573 CJ est. value
Glasgow, KY 42141

Action for Eastern Montana Glasgow Head Start Facility
Infrastructure
Results
$380,573 CJ est. value
Glasgow, KY 42141

Union Promenade
New Construction, Infrastructure - 155,000 SF
Construction
$150,000,000 CJ est. value
Union, KY 41091

Florence Apartments
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Florence, KY 41042

Renaissance on Broadway / Louisville
New Construction, Infrastructure - 20,000 SF
Pending Verification
$20,000,000 CJ est. value
Louisville, KY 40211

Residence Inn by Marriott / Florence
New Construction, Infrastructure - 104,321 SF
Pending Verification
$20,000,000 CJ est. value
Florence, KY 41042

Skilcraft Expansion
Addition, Infrastructure - 22,000 SF
Conception
$8,400,000 CJ est. value
Hebron, KY 41048

Last Updated 07/07/2023 09:06 AM
Project Title

Lebanon Bypass Water System Improvements - Phase I Contract No. 2 - Booster Pump Station Installation

Physical Address View project details and contacts
City, State (County) Lebanon, KY 40033   (Marion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $193,000 [brand] Estimate
Plans Available from Civil Engineer - 05/26/23
Owner View project details and contacts
Architect View project details and contacts
Description

The contract consists of the installation of one (1) factory built above ground water booster pump station and associated appurtenances. The packaged pump station building is being supplied by the Owner to be installed by the Contractor. The Contractor shall furnish all tools, supplies, materials, equipment, and labor necessary for the installation and commissioning of the OwnerFurnished/Contractor-Installed (OFCI) equipment. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, as indicated in the Bid Form. The Issuing Office for the Bidding Documents is Monarch Engineering, Inc., 556 Carlton Drive, Lawrenceburg, Kentucky 40342, (502) 839-1310, James L. Mudd, P.E., lmudd@monarchengineering. net. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 a.m. - 12:00 p.m. and 1:00 p.m. - 5:00 p.m., and may obtain copies of the Bidding Documents from the Issuing Office as described below. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Plans purchased by one party and bid by another party will not be accepted. Plans will be available for purchase until 4:00 p.m., (E.D.T.), May 26, 2023. Bid security shall be furnished in accordance with the Instructions to Bidders. Any bid that is obviously unbalanced may be rejected. The Marion County Water District reserves the right to reject any and all bids and waive informalities. The award will be made to the lowest, responsive, responsible bidder.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents