New Water Treatment Plant
New Construction
Design
Lancaster, OH

Water Treatment Plant Filter Media Replacement
New Construction
Bidding
$365,800 est. value
Brewster, OH

Permanganate System and Treatment Basin Improvements
New Construction
Bidding
Lima, OH

2019 Water Treatment Plant Improvements
Renovation
Post-Bid
Ironton, OH 45638

Water Treatment Plant Improvements
Post-Bid
Less than $120,000 est. value
Pleasantville, OH 43148

Water Treatment Facilities Filter Effluent Valve Replacement
Results
Less than $49,600 est. value
Ironton, OH 45638

WTP Clarifier Renovation
Results
Less than $196,000 est. value
New Concord, OH 43762

Choctaw Lake Water Treatment Plant
New Construction - 2,084 SF
Construction
$1,870,000 est. value
London, OH

Village of Commercial Point Water Treatment Plant
Construction
Commercial Point, OH 43116

7-12 Water Treatment Improvements
New Construction
Bidding
$497,500 est. value
OH

Repair of the Miami Treatment Plant Fall Protection System
Post-Bid
Dayton, OH

Renneker Water Treatment Plant (RARWTP) Membrane Softening Upgrades Project
Results
Less than $26,856,000 est. value
Lebanon, OH 45036

2020 Water Treatment Plant
New Construction - 38,800 SF
Construction
$40,570,000 est. value
Marysville, OH

Liquid Ferric Sulfate Chemical Feed System and Building Improvements
Renovation
Bidding
Cincinnati, OH 45230

Water Treatment Plant Expansion
Post-Bid
Xenia, OH 45385

Reported 10/23/2021 12:00 AM
Project Title

Water Treatment Plant Filter Media Replacement & Improvements

Physical Address View project details and contacts
City, State (County) Andover, OH 44003   (Ashtabula County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $99,996
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization, drain down and filter tank isolation; 2) filter tank media and internal parts removal and disposal; 3) re-bed two filter tanks with 142 cu. Ft. of MARIS™ media or equal; 4) re-route/reverse the treatment plumbing flow using PVC piping and fittings; and 5) perform EPA required bacteria and lab testing for startup. Alternate bid – in order of importance: 6) (if needed) refurbish the internal walls of the filter tanks and replace worn parts; 7) change the disinfection process from Chlorine gas to liquid gas by adding a chemical feed pump; and 8) install post-Chlorination chemical feed system.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 11 - Equipment.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 33 - Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents