Similar Projects
Modular Offices - Bldg 220 & 299
New Construction, Term Contract
Bidding
Rock Island, IL 61299

JPMC SW HVAC Systems and Related Services
Infrastructure
Bidding
Springfield, IL

2B Cooling System Upgrade
Post-Bid
Romeoville, IL

Various Repair Clamps
Post-Bid
Benton, IL 62812

Replace Chiller
Results
$1,000,000 to $1,400,000 est. value
Elgin, IL 60123

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Skinner West Chiller Repair
Infrastructure
Bidding
Chicago, IL

L/A HVAC Testing and Balance
Post-Bid
Peoria, IL 61635

2020 Community Center HVAC Replacement
Results
Lake Zurich, IL 60047

Abb Hvac Drivers
Term Contract
Post-Bid
Chicago, IL 60612

Habitat for Humanity Senior Rehab Program
Results
Moline, IL 61265

Insulation Repair Services for Plumbing and Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL

Replace Walk-In Coolers and Freezers
Results
Less than $400,000 est. value
Dwight, IL 60420

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Fire Station No. 2 Exterior Improvements And Roof Replacement
Renovation
Results
Springfield, IL 62701

Last Updated 06/25/2021 06:44 AM
Project Title

Misc. Cooling Tower And Structural Work

Physical Address View project details and contacts
City, State (County) Oswego, IL   (Kendall County)
Category(s) Single Trades
Sub-Category(s) HVAC, Steel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will include: Wheatlands Elementary School: Remove the existing cooling tower and replacing it with a new one. Replace existing structural support framing Thompson Junior High School: Remove and replace the existing ground mounted cooling tower. OHS: Remove and replace the exterior insulation on the exterior ductwork. Bednarcik Junior High School: Refurbish the existing cooling tower support framing. OEHS: Refurbish the existing cooling tower.

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.
Division 09 - Finishes, Painting, Exterior Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Cooling Towers, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents