Similar Projects
DFCM Construction-Doc AP&P NUCCC Chiller Replacement
Term Contract
Bidding
$300,000 est. value
Ogden, UT

HVAC Contractor
Alteration
Bidding
Moab, UT

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Canyonlands Field Airport Upgrade to Terminal Building Roof Top Units
Post-Bid
Moab, UT 84532

Residential HVAC Services
Term Contract
Results
Salt Lake City, UT 84114

HEB Southeast Tower Fume Hood Upgrade
Results
$1,521,698 est. value
Salt Lake City, UT 84112

HVAC Controls
Alteration
Bidding
Cedar City, UT

SLCC TRC CT Dust Collector
Post-Bid
Salt Lake City, UT 84130

Performing Arts Building HVAC Upgrade - Design/Build
Results
Salt Lake City, UT 84112

DFCM BCRC Cadaver Lab Redundant HVAC
Term Contract
Bidding
$94,567 est. value
Brigham City, UT 84302

Fire Station Hot Water System Re-Pipe
Post-Bid
Riverton, UT 84065

HVAC Unit Replacement for Lakeview Academy
Results
Saratoga Springs, UT 84045

Weatherization Assistance Program
Post-Bid
Orem, UT 84097

MSB HVAC Maintenance for Residential Housing and Education
Term Contract
Results
Salt Lake City, UT 84112

Department of Labor - Combustible Dust Chambers
Post-Bid
Sandy, UT

Last Updated 10/12/2021 03:57 PM
Project Title

HVAC Installation

Physical Address View project details and contacts
City, State (County) Tooele, UT   (Tooele County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This solicitation seeks qualified bidders to design and install a new propane, forced air HVAC system w ith DX cooling for Tooele Army Depot Building 1283. The project w ill include the demolition of the old system and the installation of the new system including supply ducts, return ducts, dif fusers, electrical w iring, conduits, propane gas line, regulators and electric heater in the mechanical room. The new HVAC system shall be designed to keep the building at a constant temperature in the w inter and summer months

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents