Similar Projects
Demolition and Salvage of Steel Tank at Fiveash Water Treatment Plant
Demolition
Bidding
$160,000 est. value
Oakland Park, FL 33309

Water Storage Tank Maintenance Program
Infrastructure
Bidding
Crestview, FL

Heineman Street Potable Ground Water Storage Tank and Pump Station
New Construction, Infrastructure
Sub-Bidding
$9,000,000 est. value
Daytona Beach, FL 32114

Well 3 Elevated Water Tank
Post-Bid
Sopchoppy, FL

Roof Repairs On An Above-Ground Fuel Storage Tank
Renovation
Post-Bid
Marathon, FL 33050

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Septic Systems For McDaniel Ranch
Alteration
Post-Bid
Clewiston, FL 33440

Elevated Water Tank Coating
Results
Mascotte, FL 34753

H345--FY22: Water Tank Cleaning
Term Contract
Post-Bid
Bay Pines, FL 33744

Picayune Strand Restoration Project, US41 and CR92 Conveyance Features, Design-Build Contract
Results
$5,000,000 to $10,000,000 est. value
FL

Remove and Dispose of One 2,000-Gallon Above Storage Tank (AST)
Term Contract
Post-Bid
Jacksonville, FL 32218

Full Service Maintenance Program for Water Storage Tanks
Results
Frostproof, FL 33843

East Palatka Water Plant Retrofit
Renovation
Post-Bid
$890,000 est. value
East Palatka, FL 32131

Water Storage Tank Inspection and Cleaning Services
Results
Titusville, FL 32796

Last Updated 06/29/2022 06:44 AM
Project Title

2.0 Mg Ground Tank Repair

Physical Address View project details and contacts
City, State (County) Punta Gorda, FL 33982   (Charlotte County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $64,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor(s) to provide all labor, equipment, materials and all appurtenances to replace the baffle curtain and level indicator on a 2.0 MG Ground Storage Tank located at the Water Treatment Plant, Punta Gorda, FL. Project services to include: i) Complete replacement of the baffle curtain ii) Complete replacement of the liquid level indicator. iii) Once repairs are complete Contractor must disinfect tank in accordance with AWWA C652. d) Baffle Curtain minimum requirements: i) 45mil polypropylene geomembrane with associated fiberglass angles. ii) Stainless steel cable iii) All Stainless steel hardware

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents