Similar Projects
Flood Damage Shoreline Stabilization Projects
Infrastructure
Bidding
Clayton, NY 13624

Technology Namm Hall Loading Dock Improvements with Associated Asbestos Abatement
Infrastructure
Bidding
Brooklyn, NY 11201

Removal of a Pier/ Platform
Post-Bid
Kauneonga Lake, NY 12749

Lehigh Cement Dock Repairs - CO 109 03RED03
Post-Bid
Oswego, NY 13126

Miscellaneous Structure and Outfitting Improvements
Renovation
Results
$100,000 to $250,000 est. value
Dresden, NY

Boat Launch Reconstruction
Results
Willsboro, NY 12996

Battery Coastal Resilience Project
Renovation
Pending Verification
New York, NY 10012

Bird Island Pier Rehabilitation - Group 992
Infrastructure
Bidding
Less than $1,000,000 est. value
Buffalo, NY 14213

Kayak Launch at Ontario Beach Park
Post-Bid
Canandaigua, NY 14424

Rehabilitate Fish Ladder and Viewing Platform - Salmon River Fish Hatchery
Results
$3,000,000 to $4,000,000 est. value
Altmar, NY 13302

Brooklyn Port Authority Marine Terminal Rehabilitation of Wharf B at Pier 10
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
Brooklyn, NY 11231

Niagara River and Ellicott Creek Riverfront Access and Docks Improvement
Term Contract
Post-Bid
Tonawanda, NY 14150

Replace Deteriorating Dock System at Cedar Point State Park
Results
Less than $540,222 est. value
Clayton, NY 13624

Star Island Dock Rehabilitation
Infrastructure
Bidding
Montauk, NY 11954

Fabrication of Warning Buoys
Post-Bid
Massena, NY 13662

Reported 01/14/2022 03:56 PM
Project Title

Fy22 Rochester Pier Repair

Physical Address View project details and contacts
City, State (County) Rochester, NY   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of repairing 325 feet to 428 feet of the East Pier at the mouth of the Genesee River in Rochester: Repairs consist of driving steel sheet pile on both sides of the existing concrete and timber crib pier structure, anchoring the tops of the parallel sheet pile wall together with bolted double steel channel wales and tierods, backfilling with the space between the sheet pile and existing pier structure with granular fill and placing a reinforced concrete slab over the granular fill between the sheet pile walls. Work also involves the temporary removal and reconstruction of a portion of existing rubblemound stone wave absorbers on the west side of the pier as necessary to drive the sheet pile.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents