Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

ANS Decontamination Stations Tankless Water Heater Installations
Alteration
Bidding
Denver, CO

Touchless Water Fountains Installs
Post-Bid
Lakewood, CO 80215

SCF DA Tank Docking Station Installation Bid Pack 2
Post-Bid
Less than $1,000,000 est. value
Colorado Springs, CO 80910

AFB 2141 CC 2018 Hail Damage Repairs
Results
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Chiller Plant, Fort Collins, Colorado
Results
$1,000,000 to $5,000,000 est. value
Fort Collins, CO 80521

Boiler Replacement at Baseline Water Treatment Plant
Post-Bid
Lafayette, CO 80026

Blake Boiler Replacement
Results
Denver, CO 80202

South Pool Boiler Replacement
Post-Bid
Superior, CO 80027

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

Library Leak & Temp Detection/Shut-Off Upgrade
Post-Bid
Denver, CO

Annual Maintenance - Boiler Maintenance and Repairs
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

Justice Center Water Heater
Post-Bid
Black Hawk, CO 80422

Removal and Replacement of Boiler
Results
Denver, CO

Reported 01/26/2022 09:48 AM
Project Title

Water Heater Replacement

Physical Address View project details and contacts
City, State (County) Denver, CO 80228   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Scope of work to include replacement of 10 natural gas water heaters in the first-floor units of Building 1 at Maplewood Apartments. 2. The water heater replacement selected must be capable of satisfying space heating and domestic hot water requirements for the unit. BTU sizing and gallon capacity must be in line with First Company requirements. 3. Water heater replacement must meet all applicable City and State installation requirements. 4. Water heater replacement must meet First Company best installation practices for connecting to air handler model 18CDXQ. Vendor required to coordinate with First Company to gather this information and present it in their bid. 5. The water heater replacement strategy cannot involve structural modifications to the unit. If cosmetic modifications are necessary, those will be described in detail in the Contractor’s proposal. 6. The water heater replacement must interface with existing make-up air and flue piping. 7. Existing air handler condensate is plumbed to water heater drain pan. The water heater replacement must include plumbing air handler condensate (where applicable) directly to the floor drain in the water heater closet. 8. There will be a mandatory bid walk where contractors will have the opportunity to look at three of the water heaters to be replaced. Bid walks will start at 9:00am and start every consecutive hour until 2:00pm with a total of 6 bid walks being available. Bid walks will last approximately 1 hour to visit all three units (20 minutes per unit). Two contractors will accompany an MWHS staff person on each bid walk. 9. Contractor must be appropriately licensed to complete mechanical and plumbing work in the State of Colorado and City of Lakewood.

Details

Division 22 - Plumbing, Electric Domestic Water Heaters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents