Similar Projects
New Fire Station
New Construction
Conception
$8,500,000 est. value
Colorado Springs, CO 80902

New Fire Station and City Hall
New Construction
Conception
Steamboat Springs, CO 80487

Longmont Fire Station 2 and 6
Renovation
Design
Longmont, CO 80501

Inter-Canyon Fire Station 1 & 3
New Construction - 25,500 SF
Design
Morrison, CO 80465

Police and Courts Office Renovation
Renovation
Bidding
Loveland, CO 80537

New Fire Barn No. 2
Post-Bid
Less than $3,000,000 est. value
Boulder, CO 80304

Fire Station #4 Renovation
Post-Bid
Poncha Springs, CO 81242

Fort Lupton Fire Station 3 County Road 8 & Future Rollie Avenue
New Construction
Results
Less than $6,750,000 est. value
Fort Lupton, CO

Lefthand Fire Protection District New Fire Station Number 1
Results
Boulder, CO 80302

Police Station 2nd Floor Renovation
Renovation
Construction
Black Hawk, CO 80422

Station 2 Construction Project
New Construction - 10,650 SF
Construction
Eaton, CO 80615

Boulder Fire & Rescue Station #3
New Construction - 28,370 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Boulder, CO 80301

New Fire Station
New Construction - 11,300 SF
Conception
Winter Park, CO

New Fire Station 1
New Construction - 15,000 SF
Design
$8,000,000 est. value
Evergreen, CO 80439

Construct a Detached Fire Station Support Building at Turkey Creek Complex
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Colorado Springs, Fort Carson, CO 80913

Reported 04/02/2022 12:00 AM
Project Title

CM/GC Services for the Construction of Fire Station 2

Physical Address View project details and contacts
City, State (County) Pueblo West, CO 81007   (Pueblo County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from Municipal Agency - 02/28/22
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager/General Contractor to provide construction services for the construction of a new fire station. This Project is construction of a new estimated 8,000 SF single story building designated as a critical and essential facility. Space areas will consist of fire apparatus bays, general living quarters for 24 hour firefighters, office space, common spaces (i.e. locker rooms), and will include appropriate separations of contaminates from living space of the firefighters.

Details

Fire/Police Station, 1 Story Above Grade, 8,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents