Similar Projects
Wastewater Treatment Facility Primary Clarifier No - 2
Renovation
Results
$2,300,000 est. value
Watertown, SD

Wastewater Treatment Facility Improvements - Phase I
New Construction
Results
Huron, SD

Dayton WWTP Improvements
Renovation
Post-Bid

Dayton WWTP Improvements
Renovation
Post-Bid

WWTF Improvements - Phase 1 Golf Course Force Main and WWTF Repairs
Results
$910,000 est. value
Custer, SD

Aberdeen WRF Biosolids Dewatering
Renovation
Results
Aberdeen, SD

Wastewater Treatment Plant Headworks Improvements
Renovation
Results
$1,500,000 est. value
Mobridge, SD

Furnishing of Wastewater Treatment Equipment
Post-Bid
Pierre, SD

WWTF Improvements - Phase 1B Building Modifications
Renovation
Results
$770,000 est. value
Custer, SD

2021 Hot Springs Wastewater Treatment Facility Digester Cover Replacement
Results
Hot Springs, SD

Wastewater Treatment Improvements
Renovation
Post-Bid
Fort Pierre, SD

Last Updated 02/27/2022 06:47 PM
Project Title

WRF Aeration Basin Clariflocculator and Siphon Piping

Physical Address View project details and contacts
City, State (County) Rapid City, SD   (Pennington County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 46 - Water and Wastewater Equipment, Air and Gas Diffusion Equipment, Jet Aeration Equipment, Swing-type Channel Aeration Equipment, Residuals Stabilization, Aerobic Digester Aeration Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents