Similar Projects
Burns/Mather/ Cross Water Line Design And Construction - 6064-2020-04 - City of McCall
Infrastructure
Conception
$950,000 CJ est. value
McCall, ID 83638

Wooley Avenue Reconstruction - City of McCall
Infrastructure
Conception
$1,625,000 CJ est. value
McCall, ID 83638

SFSR Overlay and Chip Seal project on the Payette National Forest
Alteration
Design
$1,000,000 to $5,000,000 est. value
McCall, ID 83638

2nd Street Mixed-Use
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
McCall, ID 83638

RFQ-Contractor Lost Valley Road Resurfacing
Infrastructure
Bidding
$600,000 CJ est. value
McCall, ID 83638

RFQ-Contractor Lost Valley Road Resurfacing
Infrastructure
Bidding
$600,000 CJ est. value
McCall, ID 83638

McCall Field Campus
New Construction, Infrastructure
Post-Bid
$39,440,000 CJ est. value
McCall, ID 83638

Lift Station 52 Bypass Project
Infrastructure
Post-Bid
$850,000 CJ est. value
McCall, ID 83638

ID Bor Lake Cascades (1) Dam Crest Road Improvements
Infrastructure
Results
$500,000 to $1,000,000 est. value
Cascade, ID 83611

For the Work of Rehabilitating the Roadway on SH-55 between MP 101.545 and 108
Infrastructure
Results
ID

Krahn Lane Self-Storage / McCall
New Construction, Infrastructure - 30,050 SF
Pending Verification
$3,200,000 CJ est. value
McCall, ID 83638

Quaker Hill Conference Center Renovation / McCall
Addition, Demolition, Renovation, Infrastructure - 9,752 SF
Pending Verification
$800,000 CJ est. value
McCall, ID 83638

Apron Reconstruction - 2956-2018-04 - City of McCall
Infrastructure
Conception
$1,300,000 CJ est. value
McCall, ID 83638

Maverik / McCall
Demolition, New Construction, Infrastructure - 5,041 SF
Design
$3,000,000 CJ est. value
McCall, ID 83638

RFP Design - Architectural proposals - New Hospital
New Construction, Infrastructure
Post-Bid
$19,500,000 CJ est. value
Cascade, ID 83611

Last Updated 07/24/2023 08:35 AM
Project Title

CON IUA SIL Huckleberry Road Reroutes

Physical Address View project details and contacts
City, State (County) McCall, ID 83638   (Valley County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project: (1094280) CON IUA SIL Huckleberry Road Reroutes Questions due July 7, 2023 by 1600 PDT Proposals Due July 17, 2023 By 1600 PDT Contracting POC: Traci Jackson, CS Traci.jackson@usda.gov Delivery Location Code: 02WW PAYETTE NATIONAL FOREST PAYETTE NATIONAL FOREST 500 N MISSION ST MCCALL ID 83638 US Mark For: USDA FOREST SERVICE SPOC INTERMOUNTAIN 1400 INDEPENDENCE AVE SW MS-1138 WASHINGTON DC 20250-0001 Period of Performance: 08/01/2023 to 10/30/2024 SIL funding 0001 0412 Const IIJA SIL Huckleberry Road Reroutes HUCKLEBERRY ROAD REROUTES General Information This project is to construct 5 sections of road. This work consists of; Staking new road sections (slope, reference, and clearing/grubbing). Constructing new road sections as specified in the plans and specifications. Payment will only be made for the items listed on the Schedule of Items all other work is incidental to those items. Contractor is to stake and construct road according to the plans and worklist provided. Staking notes/design files will be provided at time of award. The intent of the designs is to create a balanced section road that follows natural contours as shown in the designs. Work item 622.01(option F) is excavator rental (with operator) for work not covered under other work items that is identified during construction. Transport (walking) is included. Work item 30210 (option E) (Commercial source, Pit Run 4" minus, method 2) will be utilized on areas staked by COR when/if unknown wet spots are encountered during construction on road segments already covered in this solicitation. *More information in the attached SUPPLEMENTAL SPECIFICATIONS C.1 Location: Payette NF - McCall, ID C.2 Period of Performance: Contract time begins on the effective date of the Notice to Proceed (NTP) and runs until the appropriate number of calendar day's elapse. Estimated time to start work is Aug 2024 to October 2024. C.3 MAGNITUDE OF CONSTRUCTION PROJECT Between $500,000 and $1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents