Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Woods Mill Center / Maryville University Esports Arena and Mixed Use
New Construction, Infrastructure - 6,000 SF
Design
$100,000,000 CJ est. value
Town and Country, MO 63017

Bridge Replacement and Culvert Replacement
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Neier, MO 63084

Bridge Replacement and Culvert Replacement
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Neier, MO 63084

2022 Park Trail Resurfacing Project
Infrastructure
Post-Bid
$150,000 CJ est. value
Saint Louis, MO 63131

2022 Park Trail Resurfacing Project
Infrastructure
Post-Bid
$150,000 CJ est. value
Saint Louis, MO 63131

2022 Sidewalk Leveling Project
Infrastructure
Results
$50,000 est. value
Chesterfield, MO

Marine Avenue Resurfacing And West Port Plaza Drive Intersection Improvement
Infrastructure
Results
Maryland Heights, MO 63043

Logan University Fuhr Science Center
Addition, Demolition, Renovation, Infrastructure - 14,400 SF
Construction
$28,000,000 CJ est. value
Chesterfield, MO 63017

The McKenzie
New Construction, Infrastructure
Construction
$107,500,000 CJ est. value
Saint Louis, MO 63124

West Adams Avenue Condominiums / Kirkwood
New Construction, Infrastructure - 8,817 SF
Pending Verification
$2,000,000 CJ est. value
Kirkwood, MO 63122

Real Dill Pickleball Club At The District
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Chesterfield, MO 63005

Normandie Golf Club Re-Development
Demolition, New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Normandy, MO 63121

District-Wide Asphalt Repair
Term Contract
Post-Bid
Saint Louis, MO 63103

2022 Road and Parking Lot Pavement Program
Infrastructure
Results
$317,720 est. value
Town and Country, MO

Last Updated 02/13/2024 10:31 PM
Project Title

Midland Boulevard (East) Resurfacing Project

Physical Address View project details and contacts
City, State (County) Breckenridge Hills, MO 63114   (Saint Louis County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $4,600,000 [brand] Estimate
Plans Available from Copy Center - 01/01/24
Owner View project details and contacts
Architect View project details and contacts
Description

All questions must be submitted by 5:00 p.m. on February 14, 2024 via e-mail to the Contract Administrator, Shandrika Combs, SCombs@stlouiscountymo.gov. removal and replacement of deteriorated and/or damaged pavement, drive approaches, curbs, and sidewalks; pavement surfacing and texturing; superpave asphaltic concrete overlay; removal and replacement of sidewalk curb ramps, installation of traffic signal equipment, sodding and other incidental items on Midland Boulevard from Woodson Road to North and South Road. The right is reserved by the St. Louis County to reject any or all bids. The DBE Goal for this project is 12% Bids must be accompanied by a certified check or bidder's bond in an amount equal to 5% of the total bid. All checks shall be made payable to "Treasurer, St. Louis County."

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents