Similar Projects
Site Development - East Side Terminal Area - 47732185 - City Of Lee Summit
New Construction, Infrastructure
Conception
$2,653,000 CJ est. value
Lees Summit, MO 64064

Site Development - East Side Terminal Area - 47732185 - City Of Lee Summit
New Construction, Infrastructure
Conception
$2,653,000 CJ est. value
Lees Summit, MO 64064

5th Street & Life Science Center Tunnels Water Main Replacement
Infrastructure
Design
$29,626,148 est. value
Columbia, MO

Electrical and Waterline Installation
Term Contract
Design
$250,000 to $500,000 est. value
Saint Charles, MO 65355

Truman Lake Station Drainage Replacement
Infrastructure
Bidding
$5,000,000 CJ est. value
Warsaw, MO 65355

Truman Lake Station Drainage Replacement
Infrastructure
Bidding
$5,000,000 CJ est. value
Warsaw, MO 65355

Led Sign for Holt High School
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Wentzville, MO 63385

Light Lantern Metal Screen Panels Mississippi Greenway: Under I-70 Overpass
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Saint Louis, MO 63102

Valve Testing and Repairs
Term Contract
Post-Bid
Columbia, MO

Preservation Square Phase 2A - Site Prep Package
Renovation
Post-Bid
Saint Louis, MO 63106

Sitework Services
Term Contract
Results
Columbia, MO

2021 District Concrete
Results
Dardenne Prairie, Lake Saint Louis, O'Fallon, Wentzville, MO 63385

Origin Kansas City Hotel
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Kansas City, MO 64120

Lux Living South Kingshighway Boulevard Multi Residential
New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

New Student Housing - University of Missouri - Kansas City
New Construction, Infrastructure
Conception
$45,000,000 CJ est. value
Kansas City, MO 64106

Last Updated 08/10/2022 11:32 PM
Project Title

Water System Improvements - Bennett Spring State Park

Physical Address View project details and contacts
City, State (County) Lebanon, MO 65536   (Laclede County)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Concrete, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $671,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Project consists of highway road bores, wet taps, waterline connection to Laclede PWSD #1 along with new meter, pressure reducing valves, backflow prevention, main valve arrangement with pressure sustaining valve, a booster station, and the construction of water lines; complete with appurtenances, disinfection, a tracer wire system, plus pressure and leakage tests. MBE/WBE/SDVE Goals: MBE 0%, WBE 0%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents