Similar Projects
HVAC for the Warren County Courthouse
Renovation
Sub-Bidding
$829,000 CJ est. value
Monmouth, IL 61462

Replacement of The HVAC System Located in The Public Safety Building
Renovation
Sub-Bidding
$300,000 CJ est. value
Galesburg, IL 61401

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Boiler Replacement
Results
$243,300 est. value
Bement, IL 61813

Galesburg AC Replacement Rebid
Results
Galesburg, IL 61401

Replace and Install Three Gas Boiler Units
Renovation
Sub-Bidding
$300,000 CJ est. value
Okawville, IL 62271

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

WDI Chilled Water System Upgrades
Results
Decatur, IL

Logan CC Temporary Chiller Rental, GW
Alteration
Post-Bid
Lincoln, IL

Repair/Upgrade HVAC, Electrical and Plumbing Systems
Results
Less than $2,000,000 est. value
Decatur, IL 62521

Weatherization (IHWAP) Program
Term Contract
Post-Bid

Lincoln Correctional Center HVAC Repair And Maintenance
Term Contract
Results
Lincoln, IL

Geothermal Heat Pump Replacement
Alteration
Post-Bid
IL

Macon County Courthouse Boiler Replacement
Infrastructure
Results
Decatur, IL 62523

Last Updated 10/18/2022 05:33 PM
Project Title

Choate - Air Conditioning System Replacement

Physical Address View project details and contacts
City, State (County) Anna, IL 62906   (Union County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $32,883 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Emergency AC replacement for Clinical Services building Is this a Small Business Set Aside Procurement: No Is there a BEP/VBP Participation Goal : No Replacement of two AC systems in the Clinical building of Choate Center. Each system shall include: NEW AIR HANDLER AND COIL; NEW CONDENSING UNIT; SUPPLY DUCT ADAPTERS; RETURN DUCT ADAPTERS; REFRIGERATION LINE CONNECTIONS; PVC DRAIN CONNECTIONS; ELECTRICAL CONNECTIONS; LOW VOLTAGE WIRING; REMOVAL OF OLD EQUIPMENT; START UP.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents