Similar Projects
Siding/Roof Repair on Shops Buildings
Bidding
$50,000 est. value
Hagerstown, MD 21740

Roofing Repair and Maintenance
Post-Bid

Western Heights Middle School Roof Replacement
- 90,541 SF
Post-Bid
Hagerstown, MD 21740

Potterfield Pool House Roof Replacement
Results
Hagerstown, MD

Indefinite Quantity Contract to Provide Roofing Work and Related Services
Results
Less than $15,000,000 est. value

Hager House Roof Replacement Alternate Bid No. 1
Term Contract
Results
Hagerstown, MD 21740

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roof Membrane Replacement at Concocheague Wastewater Treatment Plant Multipliable Buildings
Results
Hagerstown, MD 21740

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof Replacement Phase II at South Hagerstown High School
Results
Hagerstown, MD 21740

Greenbrier Treatment Buildings Roofing Project
Results
Boonsboro, MD 21713

Salt Shed Roof Replacement
Results
Hagerstown, MD 21740

Wastewater Treatment Plant Roof Replacement
- 3,060 SF
Results
Boonsboro, MD 21713

Shop Roof & Siding Replacement
Results
Less than $50,000 est. value
Clear Spring, MD

17718 Virginia Avenue Roof Replacement
Results
$100,001 to $500,000 est. value
Hagerstown, MD 21740

Last Updated 12/03/2020 09:36 AM
Project Title

Parks and Recreation Office Roofs

Physical Address View project details and contacts
City, State (County) Hagerstown, MD 21740   (Washington County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and install the following items as needed to complete the project as shown herein: 1. Tear off and remove all vertical base flashings. the existing asphalt roof shall remain in lace 2. Install reinforced perimeter fastening strip at all vertical flashing areas. 3. Install .060 Fleeceback thermoplastic olefin (TOP) fully adhered roofing membrane directly over the existing asphalt roof area. 4. Install .060 fuuly adhered base flashings. 5. Flash all mechanical/roof penetrations. 6. Install 24-gauge metal edgings. 7. Furnish the TPO Manufacturers 20-year roof warranty. Furnish and install the following items as needed to complete the project as shown herein: 1. Sweep off and remove the gravel surfacing. 2. Tear off and remove the Asphalt down to the Tectum Roof Deck 3. Install 1 1/2 wood nailer to all open roof edges. 4. Install 1 1/2 ISO Insulation 5. Install RPF strip at all vertical flashings areas. 6. Install .060 TPO fully adhered roofing membrane and flashings. 7. Install .060 TPO adhered base flashings 8. Install 24-gaugue metal edgings 9. Furnish the TPO Manufacturers 20-year Warranty

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents