Similar Projects
Construct Wildlife Shop Facility
New Construction, Infrastructure
Conception
$1,970,900 est. value
Waukesha, WI

Stor-It Right Storage Facility / Pabst Farms Commerce Center
New Construction, Infrastructure - 122,000 SF
Design
$13,000,000 CJ est. value
Oconomowoc, WI 53066

Maple Centre - Phase 2
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Mukwonago, WI 53149

Lake Five Road Pedestrian/Bicycle Path 2023 Rebid
Infrastructure
Bidding
$192,760 CJ est. value
Hartland, WI 53029

Lake Five Road Pedestrian/Bicycle Path 2023 Rebid
Infrastructure
Bidding
$192,760 CJ est. value
Hartland, WI 53029

Bike Path
Term Contract
Post-Bid
Brookfield, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Crackfill
Results
$100,000 est. value
Merton, WI 53056

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Construction
$9,500,000 CJ est. value
Waukesha, WI 53189

ABB Inc. Headquarters
New Construction, Infrastructure - 301,320 SF
Construction
$161,000,000 CJ est. value
New Berlin, WI 53146

Atlas Metals Parts Co Expansion
Addition, New Construction, Infrastructure - 4,900 SF
Pending Verification
$260,000 CJ est. value
Waukesha, WI 53186

Brookfield Square Mall
Demolition, New Construction, Infrastructure - 370,000 SF
Pending Verification
$81,000,000 CJ est. value
Brookfield, WI 53005

Maple Centre - Phase 1
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Mukwonago, WI 53149

Baseball Pavilion Construction
Infrastructure
Bidding
$100,457 CJ est. value
Waukesha, WI 53189

Last Updated 01/27/2023 08:42 AM
Project Title

Miniwaukan Park Restroom Building Rebid

Physical Address View project details and contacts
City, State (County) Mukwonago, WI 53149   (Waukesha County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $464,951 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Est. Completion Date: Oct. 27, 2023 Pre-Qualification:Yes Pre-Bid Meeting Info: No Pre-Bid Meeting Project involves site preparation and installation of a 500 S.F. prefabricated precast concrete restroom that is to be purchased by the Contractor. Includes the installation of concrete footings and foundation, sanitary lateral, water service, 975 tons of asphaltic concrete parking lot paving, asphaltic pathway paving, concrete pavement erosion and sediment control measures, restoration of disturbed areas and miscellaneous appurtenance required to complete construction. All Work is included in a single prime contract. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Mukwonago reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. A Bidder's qualification statement must be delivered to Village of Mukwonago at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Village of Mukwonago equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Mukwonago as liquidated damages.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents