Similar Projects
Crown Coliseum Swale Repair
Infrastructure
Bidding
Fayetteville, NC

Grading, Paving and Drainage - SR 1115 - Cumberland
Infrastructure
Bidding
Hope Mills, NC 28348

Replace Grounds in the 1-7 ADA BN Motor pool X4622, Fort Bragg, NC
Post-Bid
Fayetteville, NC 28307

Pedricktown Disposal Area Complex
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value

Cross Creek Hurricane Repair and Bank Stabilization
Results
Fayetteville, NC 28301

Rankin Street Drainage Improvements
Results
Fayetteville, NC

Reinforced Concrete Pipe
Infrastructure
Post-Bid
Fayetteville, NC 28306

Distribution Drive Structural Repairs for Aerial Crossing
Results
Fayetteville, NC 28302

Reinforced Concrete Pipe
Infrastructure
Post-Bid
Fayetteville, NC 28306

Drainage Assistance Project Iverleigh Circle and Rolling Hill Road
Results
Fayetteville, NC 28302

Carnsmore Drainage Improvements
Results
Fayetteville, NC 28304

Aluminum Box Culvert with Headwalls
Results
Fayetteville, NC 28301

Headwall
Results
Fayetteville, NC 28301

Reinforced Concrete Pipe
Term Contract
Results
Fayetteville, NC 28302

Drainage Assistance Program 502 Argyll Road
Results
Fayetteville, NC 28301

Reported 09/11/2021 12:00 AM
Project Title

LEC Storm Drainage Control

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide drainage control by connecting downspouts and routing in ground to exit the curb area by core drilling. The location ofthe work to be completed is located at the Law Enforcement Center in the Rear of the building at 131 Dick St Fayetteville, NC 28301. 1. Provide and Install Approx. 2020 Liner Ft Custom Main drainage gutter, cover, and Downspouts. 2. Provide and Install PVC Pipe roof leaders to extend to parking lot below grade. 3. Core drill at curb, repair as necessary, and Compact all disturbed areas.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents