Similar Projects
Savannah Harbor DMCA 1N Dike Raising
Results
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Pipe Makers Canal Improvements - Division 2 Canal Maintenance
Results
Pooler, GA

Ditching of Savannah Disposal Areas
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Savannah, GA 31401

SHEP Sediment Basin Rock Weir and Fill Design
Term Contract
Post-Bid
$25,000,000 to $50,000,000 est. value
Savannah, GA

Nottingham Canal Storm Drainage Improvements
Results
Savannah, GA 31404

Placentia Canal Drainage Improvements
Results
Savannah, GA 31401

Placentia Canal Drainage Improvements
Results
GA 31404

Norwood Avenue Drainage Improvements
Results
Savannah, GA 31416

Pipe Makers Canal Improvements - Division 1
Post-Bid
Pooler, GA

Willow Lakes Drainage Improvements
Infrastructure
Results
GA

Forest Lakes Drainage Canal Improvements
Results
Less than $388,340 est. value
Pooler, GA 31322

Mims Street Drainage Improvements
Term Contract
Results
Savannah, GA 31416

Site Pavement and Erosion Repair
Post-Bid
Savannah, GA

Prosperity Drive, Water And Sanitary Extensions
Infrastructure, Alteration
Post-Bid
Garden City, Savannah, GA 31405

Springfield Canal Drainage
Infrastructure
Results
Savannah, GA

Last Updated 10/05/2021 11:04 AM
Project Title

Ga-Wassaw NWR Expedite Bulkhead Wingwall

Physical Address View project details and contacts
City, State (County) GA   (Chatham County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $275,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of labor, equipment, supplies and materials, to replace the bulkhead wingwalls at the North and South ends of the existing timber bulkhead to stabilize the structure and provide shoreline protection and all other items as shown on the drawings, in the specifications, and required for a complete installation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents