Similar Projects
Pre-Qualification - HVAC Contractors for Housing Office Projects
Bidding
VA

HVAC Unit Replacement at Hunton YMCA Auditorium
Post-Bid
$8,062 est. value
Norfolk, VA 23510

Standby and Emergency Generator Maintenance and Repair
Term Contract
Post-Bid
Richmond, VA 23222

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

Led Lighting Phase II
Results
$168,008 est. value
Manassas, VA

HVAC Preventive Maintenance and Repair Services
Term Contract
Post-Bid
Norfolk, VA 23510

Alexandria Train Yard ATC System Replacement
Results
$26,215,000 est. value
Alexandria, VA

HVAC Preventive Maintenance
Post-Bid
Waynesboro, VA 22980

Replacement of 7.5 Ton HVAC Unit Project
Results
$28,000 est. value
VA

The Gereau Center Chiller Replacement
Post-Bid
$199,999 est. value
Rocky Mount, VA 24151

Annual DPU Electric Utility Line Work
Term Contract
Results
$1,000,000 to $1,500,000 est. value
Richmond, VA 23219

Upgrades to Emergency Electrical System for Morningside Manor, AMP 208
Post-Bid
Roanoke, VA 24017

Johnson-Williams Middle School Controls Replacement
Results
Berryville, VA 22611

P-1049, Design-Build, Wallops Island Power Quality Upgrade at JEBLCFS Wallops Island, VA
Post-Bid
$10,000,000 to $25,000,000 est. value
Wallops Island, VA

Kempsville High School Roof Replacement and Partial HVAC Replacement
Results
Virginia Beach, VA 23464

Last Updated 07/01/2020 04:02 PM
Project Title

Replacement of Fan Motor Control Centers

Physical Address View project details and contacts
City, State (County) Cape Charles, VA   (Northampton County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project generally consists of the replacement of 24 motor control centers for the ventilation fan motors at all four (4) ventilation buildings at the Chesapeake Bay Bridge-Tunnel facility and the integration of the new motor control centers into the existing facility-wide Supervisory Control and Data Acquisition (SCADA) network.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents