Last Updated 08/01/2022 01:24 AM
Project Title

Hudson River Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Homer, GA 30547   (Banks County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $23,047,512 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 20, 2022.The project has not yet awarded. Estimated budget $17,000,000-18,000,000 The Owner will only accept bids from contractors that have been prequalified. SCOPE OF WORK: The project consists of, but is not limited to, the following major elements: Bidder agrees to furnish all materials and equipment and to perform all labor necessary to construct the Hudson River Water Reclamation Facility as shown on the attached Overall Site Plan, and as detailed in the below table entitled Table 1. Please be advised that the complete set of Drawings will be released to all prequalified contractors on April 20, 2022. The work shall include, but not be limited to, a raw sewage pump station, plant pump station, headworks with a mechanical screen and grit separator, two (2) Sequencing Batch Reactors, a post - equalization basin, a concrete structure to house a future sequencing batch reactor, tertiary disc filters, a chlorine contact chamber, an effluent structure with a low-profile cascade aerator and metering flume, an aerobic digester, a concrete structure to house a future aerobic digester, a sludge dewatering building, a bulk chemical storage structure, a chemical feed building, a blower/electrical building, a control building, instrumentation, on-site generators, electrical, and SCADA. The work also includes, but is not limited to, clearing and grubbing, earthwork, site work, yard piping, stormwater piping, asphalt and gravel roads, erosion and sediment control measures, grassing, construction staking, mobilization/demobilization, bonds, insurance delivery of materials, taxes, and all other appurtenances necessary for completion of the Work. Time allotted for completion of work is 720 calendar days from the date of a written Notice to Proceed from Owner. The Work, if awarded, will be awarded in one (1) Contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents