Similar Projects
Soccer Complex to Coolidge Road - City of East Lansing
Infrastructure
Conception
$600,000 est. value
East Lansing, MI

Dye Reservoir Vegetation Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Lansing, MI 48933

Consumers Credit Union / Meridian Charter Township
New Construction, Infrastructure - 25,000 SF
Design
$6,000,000 CJ est. value
Meridian charter Township, MI 48864

Bituminous Paving - Charlotte and Grand Ledge Garage
Infrastructure
Bidding
$400,000 CJ est. value
Lansing, MI 48933

RFP Engineering - Michigan Ave STP 2023-2024
Infrastructure
Bidding
$700,000 CJ est. value
Lansing, MI 48912

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

Wexford Montessori Site Improvements
Infrastructure
Post-Bid
Lansing, MI 48911

Excavation and Dirt Moving Services
Term Contract
Results
Mason, MI 48854

SAR - Demolition and Site Restoration
Demolition
Results
Lansing, Prudenville, MI 48651

Laylin Park Pavilion Renovations
Renovation
Post-Bid
$69,200 est. value
Mason, MI 48854

SMI Racer Site - Passive Recreation Redevelopment
Results
Lansing, MI

Sexton Site Work
Infrastructure
Post-Bid
Lansing, MI 48915

North Elementary Site Improvements
Infrastructure
Results
Lansing, MI 48911

Woodland Lake BAS - Site Improvements
Infrastructure
Post-Bid
Lansing, MI

FY21Pump Station Repairs at Dolphin Jefferson Outlet Station
Renovation
Results

Last Updated 07/26/2022 09:04 AM
Project Title

Well 25-13 Abandonment

Physical Address View project details and contacts
City, State (County) Lansing, MI 48933   (Ingham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing of Well 25-13 Abandonment. Proposals must be in full accordance with the enclosed Scope of Work. The BWL reserves the right to reject any or all Proposals, waive irregularities or technicalities in any Proposal, and accept any Proposal in whole or in part, which in the opinion of the BWL, is in its best interest. The BWL does not limit the methods or factors to be used for evaluation.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents