Similar Projects
College View Connector Sidewalk
Infrastructure
Bidding
$200,000 CJ est. value
Mississippi State, MS 39759

College View Connector Sidewalk
Infrastructure
Bidding
$200,000 CJ est. value
Mississippi State, MS 39759

MSU 2021 Parking Lot Improvements
Post-Bid
Mississippi State, MS

OCEDA NorthStar Industrial Park Building Pad - Mass Grading
Infrastructure
Post-Bid
Starkville, MS

Starkville Sportsplex Parking Lot Expansion
Results
Starkville, MS 39759

Miscellaneous County Road and Bridge Repair Work
Renovation
Results
Starkville, MS

Starkville High School Softball Press Box
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Starkville, MS 39759

Soil-Cement County Road Work
Infrastructure
Post-Bid
Starkville, MS

Mill and Overlay approximately 2 miles on SR 389 from SR 182 to US 82
Infrastructure
Results
MS

Landfill Entrance Drive Replacement
Infrastructure
Post-Bid
Starkville, MS 39759

Placement of Stripe and Raised Pavement Markers
Infrastructure
Results

MSU Bost Extended Sidewalk Improvements
Infrastructure
Post-Bid
Starkville, MS 39759

Sportsplex Parking Lot Paving
Infrastructure
Results
$169,100 est. value
Starkville, MS 39759

Poorhouse Road
Infrastructure
Post-Bid
Longview, MS 39759

District 1 2022 Road Improvements
Infrastructure
Results
$300,000 est. value
Starkville, MS

Last Updated 09/14/2022 05:53 AM
Project Title

Collegeview Connector Sidewalk

Physical Address View project details and contacts
City, State (County) Starkville, MS 39759   (Oktibbeha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The right is hereby reserved to waive informalities. Mississippi State is an equal opportunity/affirmative action employer. The work shall consist essentially of construction of concrete sidewalk, pedestrian bridge, culvert drains, lighting, re-striping of existing asphalt, and signage. The above general outline of features of the work does not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, equipment and materials required by the specifications and the drawings referred to therein

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents