Similar Projects
Rooftop Unit Replacement
Alteration
Bidding
Old Lyme, CT 06371

Town Hall/Fire Safety Complex HVAC
Alteration
Bidding
Lebanon, CT 06249

Design/Build HVAC Replacement System for John B. Stanton Elementary School
Post-Bid
Norwich, CT 06360

On Call HVAC Services
Term Contract
Post-Bid
Trumbull, CT 06611

Air Handling Units (AHU) - 10 Humidifier Replacement
Results
Less than $96,206 est. value
Farmington, CT

Z--HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) Maintenance and Repair Services and Direct Digital Controls (DDC)
Results
Groton, CT

Auditorium Air Handling Unit Replacement at King Philip Middle School
Alteration
Bidding
West Hartford, CT 06117

HVAC Systems Repair and Maintenance Services
Post-Bid
New Haven, CT

Service to the Cooling Tower
Results
Waterbury, CT 06702

Kitchen Hood Cleaning
Alteration
Bidding
Farmington, CT 06030

Cleaning of Kitchen Hood Exhaust System & Dryer Exhaust System
Post-Bid
New London, CT 06320

LOB HVAC Air Compressor System
Term Contract
Results
Hartford, CT

Chemical Water Treatment
Alteration
Bidding
Waterbury, CT 06708

HVAC Renovation Project
Post-Bid
Danbury, CT 06812

CHS and CNHMS Improvements - HVAC
Results
Coventry, CT 06238

Last Updated 01/12/2022 05:43 PM
Project Title

CVH New Cooler at Battell Hall

Physical Address View project details and contacts
City, State (County) Middletown, CT   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the replacement of an existing exterior mounted cooler, including, but not limited to the following: i) Removal of existing 10’ x 18’ cooler, metal angle structural system, roof assembly & piers. Cooler to be removed in sections and relocated on site as directed by DMHAS Engineering. ii) Removal of approximately 2 feet in length x 8 feet in height of existing 14” thick exterior wall with the installation of three new steel angle headers and plate. Installation of new aluminum diamond plate around new enlarged opening. iii) Erosion control, excavation for new foundation, and site restoration work. iv) Installation of new steel reinforced concrete foundation walls and slab. v) Installation of new 15’ x 20’ exterior cooler with associated electrical requirements and perimeter flashings per Allowance 1. vi) Removal and replacement of approximately 10 square feet of interior quarry tile finish floor. Installation of new aluminum diamond plate flooring. Installation of new diamond plate wainscoting at interior of cooler. vii) Installation/removal of a temporary wood platform for the temporary cooler and associated electrical work for the connection/disconnection of this cooler per Allowance 2. viii) Rental of a temporary 8’ x 10’ cooler for the time period between the removal of existing cooler and the installation of the new cooler per Allowance 2.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents