Similar Projects
Chandler Airport Center II
Renovation - 3,557 SF
Construction
$95,000 est. value
Chandler, AZ 85286

Taxiway B and Connectors Reconstruction Project
Results
Less than $2,984,610 est. value
Winslow, AZ

Ellsworth Channel Relocation
Results
Mesa, AZ 85201

PSHIA Terminal 4 Infrastructure Vertical and Horizontal Transportation Modernization - Phase 1
Post-Bid
$30,000,000 est. value
Phoenix, AZ 85003

Sedona Airport Apron "D" Reconstruction
Results
Less than $1,900,000 est. value
Sedona, AZ 96305

Replace AWOS at RYN
Results
Tucson, AZ 85735

Restroom Remodel - GCN Airport Terminal
Renovation
Results
Tusayan, AZ 86023

PSHIA Terminal 4 South 1 Concourse Concrete Apron Design Bid Build
Results
Phoenix, AZ 85034

Casa Grande Airport Cafe Space Improvements Project
Post-Bid
Casa Grande, AZ 85122

158 Passenger Facility
Design
Yuma, AZ 85365

Airport Job Order Contractor (JOC) For General Contracting Construction Services
Results
Flagstaff, AZ 86005

T4S1 Common-Use Airport Lounge
Renovation
Bidding
Phoenix, AZ 85034

Last Updated 07/09/2020 05:44 PM
Project Title

CBP Relocation

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85756   (Pima County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is a Tenant improvement to renovate the Executive Terminal building at Tucson International Airport for new space for Customs and Border Patrol. 5. Description of Work: The Project will primarily consist of approximately 7,200 SF of renovations to the first floor of the building to create new Global Entry Processing, General Aviation Customs Processing Area, General Office space and ancillary facilities. Primary components include demolition, interior construction, interior finishes, building specialties, plumbing, fire protection, HVAC, and electrical. 6. Location of Work: Tucson International Airport 7081 South Plumer Avenue Tucson, AZ 85756

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents